§ 47-7 — Inspection and testing of off-site construction
Code of the City of Chandler (Supp. No. 80: codified through Ordinance No. 5171, adopted July 13, 2026) · Chandler City Code § 47-7
Corpus is an independent public-information project, not the official City of Chandler website. Stable reference: corpuslaw.us/code/b7ea740d-9d23-4ad5-82a2-220c37398f1c
47-7. - Inspection and testing of off-site construction.
During off-site construction the City shall provide construction review, including testing of materials, to assess conformity to current City standard specifications and drawings. A. Inspection of the work by the designated City Engineer shall not be considered as direct control of the individual workman and the work. The direct control shall be solely the responsibility of the contractor. B. Any work done or materials used without inspection and testing or test results approved by an authorized representative of the City of Chandler may be ordered removed and replaced. Failure to reject any defective work or materials shall not in any way prevent later rejection when such defect is discovered nor obligate the designated City Engineer to final acceptance. C. The designated City Engineer, for the purpose of expediting and facilitating the progress of the work, shall not inspect all materials, and each part or detail of the work. The designated City Engineer shall be furnished at any time with such information and assistance by the contractor as is required to make a complete and detailed inspection. D. No work will be accepted which is installed prior to dedication of rights-of-way. 47-7.1. Time limit. Completion of off-site construction within the public rights-of-way under permit shall be accomplished within one (1) year after issuance of the permit unless otherwise specifically stated in the permit. This period may be extended if a hardship is acknowledged by the designated City Engineer for economic reasons, strikes, unavailability of materials, unseasonable weather or other good and sufficient cause. If an extension of time is not granted, the plans shall be resubmitted for review and a new permit covering the remaining work to be completed shall be required. Fees required under such review and new permit shall be charged according to the fee schedule in effect at the time the new review is requested or new permit is issued. 47-7.2. Fees for inspection and testing. Fees for inspection and testing shall be paid to the City at the time a permit is issued for construction work. The fee shall be computed on the basis of costs per unit of the various construction items and shall be outlined in the current fee schedule adopted by Council resolution. Quantity estimates of the various items involved shall be calculated and certified by the engineer who prepared the plans and specifications for the improvements and shall be submitted to the designated City Engineer on forms supplied by the City at the time application for a permit for the work is made. Any repetition of testing or inspection required because of inferior materials or workmanship, as determined by the City's tests, shall be performed at the developer's expense and shall be paid to the City by developer when notified by the designated City Engineer. This service does not relieve the contractor for the discovery of errors, and the correction of them, nor of the responsibility of properly performing the work. 47-7.3. Reserved.
(Ord. No. 1270, § 2, 3-8-84; Ord. No. 3061, § 3, 11-18-99; Ord. No. 4104, § 1, 10-30-08; Ord. No. 4802, § 2(Exh., § 15), 4-26-18)
Ask a question about Chandler law
Corpus searches the Chandler sections it holds and shows the ones that match, with their citations. Free, no sign-in.