§ 74-519 — Construction inspections of post-development stormwater management system

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 74-519

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/b8549705-c7e8-4b7a-9d46-52b3974effaa

Sec. 74-519. - Construction inspections of post-development stormwater management system.

(a) Inspections to ensure plan compliance during construction. Periodic inspections of the stormwater management system construction shall be conducted by the staff of the city. Construction inspections shall utilize the approved stormwater management plan and the construction sequencing plan for establishing compliance. (1) All inspections shall be documented with written reports that contain the following information: a. The date and location of the inspection; b. Whether construction is in compliance with the approved stormwater management plan and the construction sequencing plan; c. Variations from the approved construction specifications; and d. Any other variations or violations of the conditions of the approved stormwater management plan and the construction sequencing plan. (2) If any violations are found, the applicant or owner shall be notified in writing of the nature of the violation and the required corrective actions. Failure to carry out the corrective actions is a violation of this article. (b) Final inspection and as-built plans. Upon completion of a development, and prior to the final inspection pursuant to section 74-43(f) of the Code or the issuance of a certificate of occupancy or certificate of completion, the applicant or owner shall: (1) Certify that the completed development is in accordance with the approved stormwater management plan; and (2) Submit the as-built plans, certified by a professional engineer, for the stormwater management system which must show the configuration of the system. The plans must be submitted in an electronic format as determined by the department and in paper format.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20)