For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 701.050 — Temporary and seasonal gravel parking and loading areas

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 701.050

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/b965f421-f86c-44fa-b009-531b4e6d6617

Sec. 701.050. - Temporary and seasonal gravel parking and loading areas.

Temporary and seasonal gravel off-street parking and loading areas shall comply with the following: (a) Temporary use permit required. Temporary and season gravel off-street parking and loading areas shall require a Class 2 temporary use permit. (b) Submittal requirements. In addition to the submittal requirements for a Type II application under SRC chapter 300, an application for a Class 2 temporary use permit for a temporary or seasonal gravel off-street parking or loading area shall include the following: (1) A site plan, of a size and form and in the number of copies meeting the standards established by the Planning Administrator, containing the following information: (A) The total site area, dimensions, and orientation relative to north; (B) The location, total area, distance to property lines, and layout of the proposed temporary or seasonal gravel off-street parking or loading area, including the size, number, and dimensions of proposed parking or loading spaces, and the location of wheel barriers; (C) The proposed thickness of the gravel improvement; (D) The location of proposed driveways and driveway approaches; (E) The location of proposed landscaping; and (F) The location, height, and material of proposed screening. (c) Standards. Temporary and seasonal gravel off-street parking and loading areas shall comply with the standards set forth in this subsection. (1) Period of use. (A) A seasonal gravel off-street parking or loading are may be approved at the location authorized under a temporary use permit for a period not to exceed six consecutive months within any 12-month period. (B) A temporary gravel off-street parking or loading area may be approved at the location authorized under a temporary use permit for a period not to exceed one year. (C) A temporary use permit for a temporary or seasonal gravel off-street parking or loading area may be renewed annually, provided the applicant demonstrates that the facts upon which the temporary use permit was originally granted have not materially changed. The maximum cumulative total period for all such renewals shall not exceed five years. (2) Location. No temporary or seasonal gravel off-street parking or loading area shall be located within the Central Business District (CB) Zone or within 500 feet of a residential zone. (3) Size. The temporary or seasonal gravel off-street parking or loading area shall not exceed 15,000 square feet; provided, however, that any other more restrictive size requirement established by state or federal laws or rules shall be met. (4) Improvement. Temporary and seasonal gravel off-street parking and loading areas shall be improved with a minimum of four inches of base rock covered by a minimum of two inches of three-quarter inch or smaller crushed rock as a leveling course; provided, however, temporary and seasonal gravel off-street parking and loading areas used exclusively by passenger cars need only be improved with a minimum of three inches of base rock. (5) Landscaping. A landscaped area a minimum of five feet in depth shall be provided around the perimeter of the temporary or seasonal gravel off-street parking or loading area. (6) Screening. Temporary and seasonal gravel off-street parking and loading areas shall be screened from all adjacent uses by a sight-obscuring fence, wall, or hedge. Screening may be located within the perimeter landscaping required in subsection (c)(5) of this section. (7) Wheel barriers. Wheel barriers shall be provided to designate each parking space. (8) Paving upon expiration or termination. Upon expiration or termination of the temporary use permit, the temporary or seasonal gravel off-street parking or loading area shall be paved, in accordance with SRC chapter 806, or closed to vehicle access by a physical barrier. (d) Criteria. A Class 2 temporary use permit for a temporary or seasonal gravel off-street parking or loading area shall be granted if all of the following criteria are met: (1) The temporary or seasonal parking or loading need cannot otherwise be reasonably and economically met. (2) The use of the gravel off-street parking or loading area will be, in fact, temporary or seasonal. (3) The temporary or seasonal gravel off-street parking or loading area complies with the applicable standards set forth in this section.

(Ord. No. 13-21, § 1(Exh. A), 2-14-2022)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.