Sec. 28-120. - Reconstruction of tracks and pavement.
Whenever the public works director determines that any railroad tracks which enter upon or occupy any street, alley, thoroughfare, or other public property of this city need rebuilding or that the areas specified in section 28-119 need to be paved, reconstructed, maintained, or repaired to provide a safe and smooth operation for vehicle traffic or pedestrian traffic on a street, alley, thoroughfare, or other public property of this city on which the rails lie, he shall notify the railroad company or the owner responsible for the rails of the needed repairs, pavement reconstruction, or maintenance. If the repairs have not been completed within 30 calendar days from such notice, and the public works director has not granted a further extension or relief, if the same is requested by the railroad company, then the public works director is authorized to make the necessary repairs either by city forces or by contract. The cost of making these repairs, including the actual cost of city engineering and administrative expenses, shall then be assessed against the railroad in the manner as such assessments are equalized, levied and collected as otherwise provided by law for the equalization, levying and collection of special assessments.
(Code 1980, § 29-72)