For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 45-8 — Post-construction stormwater runoff release and maintenance requirements

Code of the City of Chandler (Supp. No. 80: codified through Ordinance No. 5171, adopted July 13, 2026) · Chandler City Code § 45-8

Corpus is an independent public-information project, not the official City of Chandler website. Stable reference: corpuslaw.us/code/b9f28b4b-c60e-4c51-9a7e-1dcf1c327d2d

45-8. - Post-construction stormwater runoff release and maintenance requirements.

A. If stormwater collection systems are required or ordered by the City Manager to implement BMPS to prevent pollutants from entering the public stormwater system, that person receiving the notice may petition the City Manager to reconsider the application of such post-construction stormwater controls to the premises or facility. The petition must be in writing, received within fourteen (14) calendar days of such requirement or order, must set forth any reasons for not selecting and implementing such BMPS and must propose alternatives. The City Manager will review the petition and will respond with a decision on the petition within thirty (30) calendar days of receipt. B. All stormwater collection systems built, constructed, or installed within the City of Chandler shall be maintained in accordance with the most current edition of the City of Chandler Engineering & Design Standards Manual for Public Works Construction (2023 Edition), as amended from time to time. C. It is a violation of this chapter to alter or fail to maintain a stormwater collection system such that it no longer functions as shown on the parcel's engineering plans approved by the City. D. It is a violation of this chapter to allow a stormwater collection system to fall into disrepair or to cause or allow sediment or debris to impede the proper flow or retention of stormwater. E. City staff will inspect to verify that any necessary repairs and/or maintenance modifications are reported to public works and development services to ensure all necessary connections are proper, and that the stormwater collection system functions as designed.

(Ord. No. 5087, § 2(Exh. § 2), 7-15-24)

Ask a question about Chandler law

Corpus searches the Chandler sections it holds and shows the ones that match, with their citations. Free, no sign-in.