12.48.030 - Permit required.
(a) No person shall move or operate upon any of the city streets any vehicle with a load or loads in excess of those permitted by the Vehicle Code without a written permit from the city engineer.
(b) The city engineer may, by written permit authorize a load or loads in excess of those allowed for in the Vehicle Code if, in his judgment, the streets upon which the vehicle is to be operated can safely withstand the additional weight or if the applicant will guarantee to the city that all costs of repair to the streets or to the public property of the city damaged by the movement of such load or loads will be paid in full. The permit shall be granted upon such conditions and upon depositing such bond as the city engineer in his discretion may require.
(c) For any permit so issued, there shall be a charge and the permittee shall pay a fee as follows: Purple loading trip, five dollars per trip per vehicle; Green loading trip, five dollars per trip per vehicle or fifty dollars annually per vehicle.
(d) That certain manual entitled "Manual of the Policy, Procedures, Rules and Regulations for Use in Issuing Transportation Permits, 1975" as adopted and hereinafter revised by the State of California Department of Transportation is adopted by reference.
(e) Whenever the city engineer deems a police escort necessary or advisable in connection with any operation under the permit, the permittee shall pay the current charge for the escort so required.
(Ord. 822 §§ 1, 2, 1982: Ord. 589 § 1, 1978: Ord. 364 § 1 (part), 1972)