§ 12-1104 — General conditions/requirements
Official Code of the City of Clarksville (Supp. No. 110: codified through Ordinance No. 64-2025-26, enacted May 7, 2026) · Clarksville City Code § 12-1104
Corpus is an independent public-information project, not the official City of Clarksville website. Stable reference: corpuslaw.us/code/ba4e122c-1c48-4c46-ac43-5088138ceb1b
Sec. 12-1104. - General conditions/requirements.
(a) Submission of plan for approval. The location and design of driveways and/or accesses providing vehicular access from arterial, collector and local roads to any existing lot or lots proposed for creation by the subdivision of property in all zoning districts shall be specified in an access plan submitted by the applicant to the CSD for review and approval. The time for review of said access plan shall be no longer than ten (10) working days. No curbs or rights-of-way shall be cut, paved or otherwise altered until an access permit approving the access plan has been secured from the CSD and/or any other governmental agency owning or controlling the road right-of-way. An access permit must be issued prior to the issuance of a building permit. (b) Traffic impact study. The CSD may require at no cost to the city a traffic impact study by a qualified registered professional engineer using the standard format specified by the Institute of Transportation Engineers (ITE) publication "Traffic Access and Impact Studies for Site Development", ITE, 1991 or the latest subsequent edition to assess the traffic impacts of a proposed access to the adjoining and nearby public roadways and intersections when the expected number of trips generated by the proposed building or land use exceeds an estimated one thousand (1,000) vehicle trips per day or one hundred (100) peak hour vehicle trips per day. In addition, the CSD may require a traffic impact study for sites that generate less than one thousand (1,000) vehicle trips per day or one hundred (100) peak hour vehicle trips per day if such sites are located at or near high volume intersections. The CSD may waive this provision if a traffic study has been completed within the last three (3) years from which needed traffic data can be extrapolated. Unless otherwise specified by the CSD, the study shall, at a minimum, address trip generation and directional distribution, traffic assignment to roadways and access locations, 24-hour and a.m. and p.m. peak hour traffic forecasting (nonsite and onsite), capacity analysis and level of service for adjoining roadways and nearby intersections before and after the proposed full development, geometric design and safety deficiencies, on-site circulation design that may impact access operations, recommendations for roadway improvements and traffic control installation and/or modifications to existing, sign, signals and markings. All traffic generation data used in the study shall be consistent with land use and density data as referenced in Trip Generation, 7 th edition, 2004, published by the Institute of Transportation Engineers, or the latest subsequent edition; current city and state traffic counts for surrounding public roadways; and the marketing study for the proposed building or land use. (c) Approval for specific land use. Any access existing, as of December 12, 2006, shall be approved for the existing land use only. Any access approved under this chapter shall be approved for the land use(s) specified in the access plan. Any change in such land use(s) that would increase traffic shall require a new approval of access by the governing jurisdiction. When a site existing at the time of this chapter is redeveloped in a manner so as to generate an increase in traffic, the existing driveways shall be brought into conformity with the provisions of this chapter to the greatest extent feasible or possible. Any tract of land that has received and has maintained an active preliminary plat approval from the regional planning commission on December 12, 2006 is exempt from the criteria of this chapter. (d) Expiration of approval. Any access plan for commercial or service institution land uses including related offsite public road improvements approved hereunder shall be constructed within eighteen (18) months of approval or such approval shall terminate. If unusual or extraordinary circumstances exist which prevent the applicant from completing the proposed project and related access within the 18-month deadline, a written request for extension beyond that time and/or modifications to the existing approved access plan shall be approved, in writing, by the CSD. (e) Bond requirements. Prior to the issuance of a written approval of the access plan, the applicant may be required to provide a cash deposit, bond, or other form of security acceptable to the CSD and pursuant to CSD procedures and requirements sufficient to complete access, roadway and traffic control improvements on the public right-of-way as specified in the approved plan. The improvements shall be constructed in accordance with specifications established in the city street specifications. The CSD shall set the amount and time of the bond, based on the estimated cost of the implementation of the approved plan plus an additional five (5) percent. Within thirty (30) days of the notice by the applicant of completion of all provisions of the approved plan, the city shall determine acceptance or identify items necessary to satisfactorily complete the project. The developer/contractor shall warrant the performance of the improvements on the right-of-way for a period of one (1) year from acceptance of the project. Said bond shall not be required when improvements are made on a designated state route due to this improvement already requiring bonding through TDOT. (f) Prohibition of unsafe access. Notwithstanding any other provisions of this Code to the contrary, any access may be denied based on commonly accepted and applied traffic engineering principles that demonstrate a potential threat or danger to the public and/or affect the safe and efficient flow of traffic.
(Ord. No. 107-2005-06, § IV, 12-7-06)
Ask a question about Clarksville law
Corpus searches the Clarksville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
