§ 15.14.415 — Significant noncompliance
San José Municipal Code (Supp. No. 5: codified through Ordinance No. 31341, enacted August 25, 2026) · San José Municipal Code § 15.14.415
Corpus is an independent public-information project, not the official City of San Jose website. Stable reference: corpuslaw.us/code/ba772107-9a88-4e55-a96a-06b0d0939db9
15.14.415 - Significant noncompliance.
An industrial user is in "significant noncompliance" if it has a violation or violations meeting one or more of the following criteria: A. Chronic violations of wastewater discharge limits defined here as those in which sixty-six percent or more of all the measurements taken during a six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits, as defined by 40 CFR 403.3(l); B. Technical review criteria (TRC) violations, defined here as those in which thirty-three percent or more of all the measurements for each pollutant parameter taken during a six-month period equal or exceed the product of the numeric pretreatment standard or requirement including instantaneous limits, as defined by 40 CFR 403.3(l) multiplied by the applicable TRC (TRC = 1.4 for BOD, TSS, fats, oil and grease, and 1.2 for all other pollutants except pH; C. Any other violation of a pretreatment standard or requirement as defined by 40 CFR 403.3 (l) (daily maximum, long-term average, instantaneous limit, or narrative standard) that the director determines has caused, alone or in combination with other discharges, interference or pass through (including endangering the health of the director personnel or the general public); D. Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or to the environment or has resulted in the plant's exercise of its emergency authority to halt or prevent such a discharge; E. Failure to meet, within ninety days after the scheduled due date, a compliance schedule milestone contained in a discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; F. Failure to provide, within forty-five days after the due date, required reports such as baseline monitoring reports, ninety-day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules; G. Failure to accurately report noncompliance; and H. Any other violation or group of violations, which may include a violation of reasonable control measures, which the director determines will adversely affect the operation or implementation of the pretreatment program.
(Ord. 28179.)
Ask a question about San Jose law
Corpus searches the San Jose sections it holds and shows the ones that match, with their citations. Free, no sign-in.
