§ 93.0201 — PERMIT REQUIRED
Los Angeles Municipal Code (2026 Rev. 9, current through legislation effective June 30, 2026) · Los Angeles Municipal Code § 93.0201
Corpus is an independent public-information project, not the official City of Los Angeles website. Stable reference: corpuslaw.us/code/bb29a178-0752-4ac9-8698-a7fc5b53f0ab
SEC. 93.0201. PERMIT REQUIRED.
(Amended by Ord. No. 187,719, Eff. 1/23/23.) No person shall, install, alter, reconstruct, or repair any electrical wiring unless a permit therefor has been obtained from the Department except as otherwise provided in this Code. A permit is required for solar powered, stand-alone equipment, including, but not limited to, solar powered pole-mounted luminaires. EXCEPTIONS: 1. A separate electrical permit shall not be required for any electrical wiring for which a combined building-mechanical permit has been obtained pursuant to LAMC Subsection 91.107.2.2. 2. No person shall be subject to fine, imprisonment or payment of an investigation fee for starting or doing any electrical wiring without a permit being first obtained if a permit is obtained therefor on or before 12:00 noon on the third day the office of the Department is open for public business after the electrical wiring was started.
Ask a question about Los Angeles law
Corpus searches the Los Angeles sections it holds and shows the ones that match, with their citations. Free, no sign-in.
