For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-13-44 — IGCC GREEN CONSTRUCTION CODE AMENDMENT, SECTION 701.3.4 (7.3.4), AUTOMATED DEMAND RESPONSE (OPTIONAL)

City Code of Boise City, Idaho (2026 S-32: current through Ord. 38-26, passed 9-29-2026) · Boise City Code § 9-13-44

Corpus is an independent public-information project, not the official City of Boise City website. Stable reference: corpuslaw.us/code/bba67f55-5560-45fa-a539-891b22a41fd4

9-13-44: IGCC GREEN CONSTRUCTION CODE AMENDMENT, SECTION 701.3.4 (7.3.4), AUTOMATED DEMAND RESPONSE (OPTIONAL):

701.3.4 (7.3.4) Automated Demand Response (Optional). When chosen to be complied with, building projects may contain automatic control systems that have the capability to reduce building equipment loads to lower electric peak demand of the building. The building controls may be designed with automated demand-response (DR) infrastructure capable of receiving DR requests from the utility, electrical system operator, or third-party DR program provider and automatically implementing load adjustments to the HVAC and lighting systems. Consult with local utility company for any possible eligibility requirements. (Ord. 9-23, 3-7-2023)

Ask a question about Boise City law

Corpus searches the Boise City sections it holds and shows the ones that match, with their citations. Free, no sign-in.