Earth Stations
47 C.F.R. Part 25, Earth Stations
in effect47 C.F.R. § 25.132 Verification of earth station antenna performance.
(a)(1) Except as provided in paragraph (a)(2) of this section, applications for transmitting earth stations in the FSS, including feeder-link stations, must include a certification that the applicant has reviewed the results of a series of radiation pattern tests performed by the antenna manufacturer on representative equipment in representative configurations, and the test results demonstrate that the equipment meets relevant off-axis gain standards in § 25.209, measured in accordance with paragraph (b)(1) of this section. Applicants and licensees must be prepared to submit the radiation pattern measurements to the Commission on request.
(2) Applicants that specify off-axis EIRP density pursuant to § 25.115(g)(1) are exempt from the certification requirement in paragraph (a)(1) of this section.
(b)(1) For purposes of paragraph (a)(1) of this section and § 25.115(g)(1), the following measurements on a production antenna performed on calibrated antenna range must be made at the top and bottom of each frequency band assigned for uplink transmission:
(i)(A) Co-polarized gain in the azimuth plane must be measured across a range extending to 180° on each side of the main-lobe axis, and the measurements must be represented in two plots: one across the entire angular range of ±180° from the main-lobe axis and the other across ±10° from the main-lobe axis.
(B) Co-polarized gain must be measured from 0° to 30° from beam peak in the elevation plane.
(ii) Cross-polarization gain must be measured across a range of plus and minus 7° from beam peak in the azimuth and elevation planes.
(iii) Main beam gain.
(iv) For antennas with asymmetric apertures or beams, where the minor axis of the antenna beam (major axis of the antenna aperture) will not always be aligned parallel to the plane tangent to the GSO arc, the measurements in paragraphs (b)(1)(i) through (iii) of this section must be made over the angular ranges specified in paragraphs (b)(1)(i)(A) and (B) of this section in two orthogonal planes, with the antenna oriented at the maximum skew angle at which it will operate.
(2) The relevant envelope specified in § 25.209 must be superimposed on each measured pattern.
(c) The tests specified in paragraph (b) of this section are normally performed at the manufacturer's facility; but for those antennas that are very large and only assembled on-site, on-site measurements may be used for product qualification data. If on-site data is to be used for qualification, the test frequencies and number of patterns should follow, where possible, the recommendations in paragraph (b) of this section, and the test data is to be submitted in the same manner as described in paragraph (a) of this section.
(d) For each new or modified transmitting antenna over 3 meters in diameter, the following on-site verification measurements must be completed at one frequency on an available transponder in each frequency band of interest and submitted to the Commission.
(1) Co-polarized patterns in the elevation plane, plus and minus 7 degrees, in the transmit band.
(2) Co-polarized patterns in the azimuth and elevation planes, plus and minus 7 degrees, in the receive band.
(3) System cross-polarization discrimination on-axis. The FCC envelope specified in § 25.209 shall be superimposed on each pattern. The transmit patterns are to be measured with the aid of a co-operating earth station in coordination with the satellite system control center under the provisions of § 25.272.
(e) Certification that the tests required by paragraph (c) of this section have been satisfactorily performed shall be provided to the Commission in notification that construction of the facilities has been completed as required by § 25.133.
(f) Antennas less than 3 meters in diameter and antennas on simple (manual) drive mounts that are operated at a fixed site are exempt from the requirements of paragraphs (c) and (d) of this section provided that a detailed technical showing is made that confirms proper installation, pointing procedures, and polarization alignment and manufacturing quality control. These showing must also include a plan for periodic testing and field installation procedures and precautions.
(g) Records of the results of the tests required by this section must be maintained at the antenna site or the earth station operator's control center and be available for inspection.
47 C.F.R. § 25.133 Period of construction; certification of commencement of operation.
(a) An earth station, or network of blanket-licensed earth stations, must be brought into operation within the longest of the time periods below, unless the Commission determines otherwise:
(1) For an earth station authorized to communicate with a GSO FSS space station in the 3600-4200 MHz band (space-to-Earth) operating outside of CONUS, or in the 5850-6725 MHz band (Earth-to-space), within one year from the date of the license grant;
(2) For any other earth station or network of earth stations, within one year from the date of the license grant or six months after the bringing into operation of a GSO space station, or NGSO system under § 25.164(b)(1), with which the earth station or earth station network was authorized to communicate when it was licensed, as notified under § 25.173(b).
(b)(1) Each initial license for a transmitting earth station or modified license authorizing operation of an additional transmitting antenna, except for blanket licenses, will also specify as a condition therein that upon completion of construction, the licensee must file with the Commission a certification containing the following information:
(i) The name of the licensee;
(ii) File number of the application;
(iii) Call sign of the antenna;
(iv) Date of the license;
(v) A certification that the facility as authorized has been completed and that each antenna has been tested and found to perform within authorized gain patterns or off-axis EIRP density levels; and
(vi) The date when the earth station became operational.
(vii) A statement that the station will remain operational during the license period unless the license is submitted for cancellation.
(2) For FSS earth stations authorized under a blanket license, the licensee must notify the Commission when the earth station network commences operation. The notification should include the information described in paragraphs (b)(1)(i) through (iv) of this section and a certification that each hub antenna, and a type of antenna used in remote stations in the network, has been tested and found to perform within authorized gain patterns or off-axis EIRP density levels. For any type of antenna whose performance was not certified when the network commenced operation, the licensee must submit the information and certification stated above for the antenna type when it is first deployed.
(c) [Reserved]
(d) Each receiving earth station licensed or registered pursuant to § 25.115(b) must be constructed and placed into service within 6 months after coordination has been completed. Each licensee or registrant must file with the Commission a certification that the facility is completed and operating as provided in paragraph (b) of this section, with the exception of certification of antenna patterns.
47 C.F.R. § 25.134 [Reserved]
47 C.F.R. § 25.135 Licensing provisions for earth station networks in the non-voice, non-geostationary Mobile-Satellite Service.
(a) Each applicant for a blanket earth station license in the non-voice, non-geostationary mobile-satellite service shall demonstrate that transceiver operations will not cause unacceptable interference to other authorized users of the spectrum, based on existing system information publicly available at the Commission at the time of filing, and will comply with operational conditions placed upon the systems with which they are to operate in accordance with § 25.142(b). This demonstration shall include a showing as to all the technical parameters, including duty cycle and power limits, under which the individual user transceivers will operate.
(b) [Reserved]
(c) Transceiver units in this service are authorized to communicate with and through U.S.-authorized space stations only.
47 C.F.R. § 25.136 Earth Stations in the 24.75-25.25 GHz, 27.5-28.35 GHz, 37.5-40 GHz, 47.2-48.2, GHz and 50.4-51.4 GHz bands.
(a) FSS is secondary to the Upper Microwave Flexible Use Service in the 27.5-28.35 GHz band. Notwithstanding that secondary status, an applicant for a license for a transmitting earth station in the 27.5-28.35 GHz band that meets one of the following criteria may be authorized to operate without providing interference protection to stations in the Upper Microwave Flexible Use Service:
(1) The FSS licensee also holds the relevant Upper Microwave Flexible Use Service license(s) for the area in which the earth station generates a power flux density (PFD), at 10 meters above ground level, of greater than or equal to −77.6 dBm/m
2/MHz;
(2) The FSS earth station was authorized prior to July 14, 2016; or
(3) The application for the FSS earth station was filed prior to July 14, 2016 and has been subsequently granted; or
(4) The applicant demonstrates compliance with all of the following criteria in its application:
(i) There are no more than two other authorized earth stations operating in the 27.5-28.35 GHz band within the county where the proposed earth station is located that meet the criteria contained in either paragraph (a)(1), (2), (3), or (4) of this section. For purposes of this requirement, multiple earth stations that are collocated with or at a location contiguous to each other shall be considered as one earth station;
(ii) The area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m2/MHz, together with the similar area of any other earth station authorized pursuant to paragraph (a) of this section, does not cover, in the aggregate, more than the amount of population of the UMFUS license area within which the earth station is located as noted in table 1 to this paragraph (a)(4)(ii):
Table 1 to Paragraph (a)(4)(ii)
Population within UMFUS license area
Maximum permitted aggregate population
within −77.6 dBm/m
2/MHz PFD contour
of earth stations
Greater than 450,0000.1 percent of population in UMFUS license area.
Between 6,000 and 450,000450 people.
Fewer than 6,0007.5 percent of population in UMFUS license area.
(iii) The area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m
2/MHz does not contain any major event venue, urban mass transit route, passenger railroad, or cruise ship port. In addition, the area mentioned in paragraph (a)(4)(ii) of this section shall not cross any of the following types of roads, as defined in functional classification guidelines issued by the Federal Highway Administration pursuant to 23 CFR 470.105(b): Interstate, Other Freeways and Expressways, or Other Principal Arterial. The Federal Highway Administration Office of Planning, Environment, and Realty Executive Geographic Information System (HEPGIS) map contains information on the classification of roads. For purposes of this rule, an urban area shall be an Adjusted Urban Area as defined in section 101(a)(37) of Title 21 of the United States Code.
(iv) The applicant has successfully completed frequency coordination with the UMFUS licensees within the area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m
2/MHz with respect to existing facilities constructed and in operation by the UMFUS licensee. In coordinating with UMFUS licensees, the applicant shall use the applicable processes contained in § 101.103(d) of this chapter.
(b) Applications for earth stations in the 37.5-40 GHz band shall provide an exhibit describing the zone within which the earth station will require protection from transmissions of Upper Microwave Flexible Use Service licensees. For purposes of this rule, the protection zone shall consist of the area where UMFUS licensees may not locate facilities without the consent of the earth station licensee. The earth station applicant shall demonstrate in its application, using reasonable engineering methods, that the requested protection zone is necessary in order to protect its proposed earth station.
(c) The protection zone (as defined in paragraph (b) of this section) shall comply with the following criteria. The applicant must demonstrate compliance with all of the following criteria in its application:
(1) There are no more than two other authorized earth stations operating in the 37.5-40 GHz band within the county within which the proposed earth station is located that meet the criteria contained in paragraph (c) of this section, and there are no more than 14 other authorized earth stations operating in the 37.5-40 GHz band within the PEA within which the proposed earth station is located that meet the criteria contained in paragraph (c) of this section. For purposes of this requirement, multiple earth stations that are collocated with or at a location contiguous to each other shall be considered as one earth station;
(2) The protection zone, together with the protection zone of other earth stations in the same PEA authorized pursuant to this, does not cover, in the aggregate, more than the amount of population of the PEA within which the earth station is located as noted in table 2 to this paragraph (c)(2):
Table 2 to Paragraph (c)(2)
Population within Partial Economic Area (PEA) where earth station is located
Maximum permitted aggregate population
within protection zone of earth stations
Greater than 2,250,0000.1 percent of population in PEA.
Between 60,000 and 2,250,0002,250 people.
Fewer than 60,0003.75 percent of population in PEA.
(3) The protection zone does not contain any major event venue, urban mass transit route, passenger railroad, or cruise ship port. In addition, the area mentioned in the preceding sentence shall not cross any of the following types of roads, as defined in functional classification guidelines issued by the Federal Highway Administration pursuant to 23 CFR 470.105(b): Interstate, Other Freeways and Expressways, or Other Principal Arterial. The Federal Highway Administration Office of Planning, Environment, and Realty Executive Geographic Information System (HEPGIS) map contains information on the classification of roads. For purposes of this rule, an urban area shall be an Adjusted Urban Area as defined in section 101(a)(37) of Title 21 of the United States Code.
(4) The applicant has successfully completed frequency coordination with the UMFUS licensees within the protection zone with respect to existing facilities constructed and in operation by the UMFUS licensee. In coordinating with UMFUS licensees, the applicant shall use the applicable processes contained in § 101.103(d) of this chapter.
(d) Notwithstanding that FSS is co-primary with the Upper Microwave Flexible Use Service in the 47.2-48.2 GHz band, earth stations in the 47.2-48.2 GHz band shall be limited to individually licensed earth stations. An applicant for a license for a transmitting earth station in the 47.2-48.2 GHz band must meet one of the following criteria to be authorized to operate without providing any additional interference protection to stations in the Upper Microwave Flexible Use Service:
(1) The FSS licensee also holds the relevant Upper Microwave Flexible Use Service license(s) for the area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m
2/MHz; or
(2) The earth station in the 47.2-48.2 GHz band was authorized prior to February 1, 2018; or
(3) The application for the earth station in the 47.2-48.2 GHz band was filed prior to February 1, 2018; or
(4) The applicant demonstrates compliance with all of the following criteria in its application:
(i) There are no more than two other authorized earth stations operating in the 47.2-48.2 GHz band within the county where the proposed earth station is located that meet the criteria contained in paragraph (d)(1), (2), (3), or (4) of this section, and there are no more than 14 other authorized earth stations operating in the 47.2-48.2 GHz band within the PEA where the proposed earth station is located that meet the criteria contained in paragraph (d)(1), (2), (3), or (4) of this section. For purposes of this requirement, multiple earth stations that are collocated with or at a location contiguous to each other shall be considered as one earth station;
(ii) The area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m
2/MHz, together with the similar area of any other earth station authorized pursuant to paragraph (d) of this section, does not cover, in the aggregate, more than the amount of population of the PEA within which the earth station is located as noted in table 3 to this paragraph (d)(4)(ii):
Table 3 to Paragraph (d)(4)(ii)
Population within Partial Economic Area (PEA) where earth station is located
Maximum permitted aggregate population
within −77.6 dBm/m
2/MHz PFD contour
of earth stations
Greater than 2,250,0000.1 percent of population in PEA.
Between 60,000 and 2,250,0002,250 people.
Fewer than 60,0003.75 percent of population in PEA.
(iii) The area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m
2/MHz does not contain any major event venue, any highway classified by the U.S. Department of Transportation under the categories Interstate, Other Freeways and Expressways, or Other Principal Arterial, or an urban mass transit route, passenger railroad, or cruise ship port; and
(iv) The applicant has successfully completed frequency coordination with the UMFUS licensees within the area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m
2/MHz with respect to existing facilities constructed and in operation by the UMFUS licensee. In coordinating with UMFUS licensees, the applicant shall use the applicable processes contained in § 101.103(d) of this chapter.
(e) Notwithstanding that FSS is co-primary with the Upper Microwave Flexible Use Service in the 24.75-25.25 GHz and 50.4-51.4 GHz bands, earth stations in these bands shall be limited to individually licensed earth stations. An applicant for a license for a transmitting earth station in the 24.75-25.25 GHz or 50.4-51.4 GHz band must meet one of the following criteria to be authorized to operate without providing any additional interference protection to stations in the Upper Microwave Flexible Use Service:
(1) The FSS licensee also holds the relevant Upper Microwave Flexible Use Service license(s) for the area in which the earth station generates a power flux density (PFD), at 10 meters above ground level, of greater than or equal to −77.6dBm/m
2/MHz;
(2) The earth station in the 24.75-25.25 GHz band was authorized prior to August 20, 2018; or the earth station in the 50.4-51.4 GHz band was authorized prior to June 12, 2019; or
(3) The application for the earth station in the 24.75-25.25 GHz band was filed prior to August 20, 2018; or the application for the earth station in the 50.4-51.4 GHz band was filed prior to June 12, 2019; or
(4) The applicant demonstrates compliance with all of the following criteria in its application:
(i) There are no more than two other authorized earth stations operating in the same frequency band within the county where the proposed earth station is located that meet the criteria contained in either paragraph (e)(1), (2), (3), or (4) of this section, and there are no more than 14 other authorized earth stations operating in the same frequency band within the Partial Economic Area where the proposed earth station is located that meet the criteria contained in paragraph (e)(1), (2), (3), or (4) of this section. For purposes of the requirement in this paragraph (e)(4), multiple earth stations that are collocated with or at a location contiguous to each other shall be considered as one earth station;
(ii) The area in which the earth station generates a power flux density (PFD), at 10 meters above ground level, of greater than or equal to −77.6 dBm/m
2/MHz, together with the similar area of any other earth station operating in the same frequency band authorized pursuant to paragraph (e) of this section, does not cover, in the aggregate, more than the amount of population of the county within which the earth station is located as noted in table 4 to this paragraph (e)(4)(ii):
Table 4 to Paragraph (e)(4)(ii)
Population within the County where earth station is located
Maximum permitted aggregate population within −77.6 dBm/m
2/MHz PFD contour of earth stations
Greater than 450,0000.1 percent of population in county.
Between 6,000 and 450,000450 people.
Fewer than 6,0007.5 percent of population in county.
(iii) The area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m2/MHz does not contain any major event venue, urban mass transit route, passenger railroad, or cruise ship port. In addition, the area mentioned in paragraph (e)(4)(ii) of this section shall not cross any of the following types of roads, as defined in functional classification guidelines issued by the Federal Highway Administration pursuant to 23 CFR 470.105(b): Interstate, Other Freeways and Expressways, or Other Principal Arterial. The Federal Highway Administration Office of Planning, Environment, and Realty Executive Geographic Information System (HEPGIS) map contains information on the classification of roads. For purposes of this paragraph (e)(4), an urban area shall be an Adjusted Urban Area as defined in section 101(a)(37) of Title 21 of the United States Code; and
(iv) The applicant has successfully completed frequency coordination with the UMFUS licensees within the area in which the earth station generates a PFD, at 10 meters above ground level, of greater than or equal to −77.6 dBm/m2/MHz with respect to existing facilities constructed and in operation by the UMFUS licensee. In coordinating with UMFUS licensees, the applicant shall use the applicable processes contained in § 101.103(d) of this chapter.
(f) If an earth station applicant or licensee in the 24.75-25.25 GHz, 27.5-28.35 GHz, 37.5-40 GHz, 47.2-48.2 GHz and/or 50.4-51.4 GHz bands enters into an agreement with an UMFUS licensee, their operations shall be governed by that agreement, except to the extent that the agreement is inconsistent with the Commission's rules or the Communications Act.
(g) Any earth station authorizations issued pursuant to paragraph (a)(4), (c), (d)(4), or (e)(4) of this section shall be conditioned upon operation being in compliance with the criteria contained in the applicable paragraph.
(h) Re-coordination. An earth station licensed under this section that is brought into operation later than one year after the date of the license grant must be re-coordinated with UMFUS stations using the applicable processes in § 101.103(d) of this chapter. The earth station licensee must complete re-coordination within one year before its commencement of operation. The re-coordination should account for any demographic or geographic changes as well as changes to the earth station equipment or configuration. A re-coordination notice must be filed in ICFS before commencement of earth station operations.
47 C.F.R. § 25.137 Requests for U.S. market access through non-U.S.-licensed space stations.
Link to an amendment published at 90 FR 41801, Aug. 27, 2025.
(a) Earth station applicants requesting authority to communicate with a non-U.S.-licensed space station and entities filing a petition for declaratory ruling to access the United States market using a non-U.S.-licensed space station must attach an exhibit with their FCC Form 312 demonstrating that U.S.-licensed satellite systems have effective competitive opportunities to provide analogous services in:
(1) The country in which the non-U.S. licensed space station is licensed; and
(2) All countries in which communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing that there are no practical or legal constraints that limit or prevent access of the U.S. satellite system in the relevant foreign markets. The exhibit required by this paragraph must also include a statement of why grant of the application is in the public interest. This paragraph shall not apply with respect to requests for authority to operate using a non-U.S. licensed satellite that is licensed by or seeking a license from a country that is a member of the World Trade Organization for services covered under the World Trade Organization Basic Telecommunications Agreement.
(b) Any request pursuant to paragraph (a) of this section must be filed electronically through the International Communications Filing System and must include an exhibit providing legal and technical information for the non-U.S.-licensed space station of the kind that § 25.114, § 25.122, § 25.123, or § 25.125 would require in a license application for that space station, including but not limited to information required to complete Schedule S. An applicant may satisfy the requirement in this paragraph (b) by cross-referencing a pending application containing the requisite information or by citing a prior grant of authority to communicate via the space station in question in the same frequency bands to provide the same type of service.
(c) A non-U.S.-licensed NGSO-like satellite system seeking to serve the United States can be considered contemporaneously with other U.S. NGSO-like satellite systems pursuant to § 25.157 and considered before later-filed applications of other U.S. satellite system operators, and a non-U.S.-licensed GSO-like satellite system seeking to serve the United States can have its request placed in a queue pursuant to § 25.158 and considered before later-filed applications of other U.S. satellite system operators, if the non-U.S.-licensed satellite system:
(1) Is in orbit and operating;
(2) Has a license from another administration; or
(3) Has been submitted for coordination to the International Telecommunication Union.
(d) Earth station applicants requesting authority to communicate with a non-U.S.-licensed space station and entities filing a petition for declaratory ruling to access the United States market must demonstrate that the non-U.S.-licensed space station has complied with all applicable Commission requirements for non-U.S.-licensed systems to operate in the United States, including but not limited to the following:
(1) Milestones;
(2) Reporting requirements;
(3) Any other applicable service rules;
(4) The surety bond requirement in § 25.165, for non-U.S.-licensed space stations that are not in orbit and operating.
(5) Entities that have one market access request on file with the Commission for NGSO-like satellite operations in a particular frequency band will not be permitted to request access to the U.S. market for another NGSO-like satellite system in that frequency band in the same processing round subject to the procedures of §§ 25.157 and 25.261.
(e) An entity requesting access to the United States market through a non-U.S.-licensed space station pursuant to a petition for declaratory ruling may amend its request by submitting an additional petition for declaratory ruling. Such additional petitions will be treated on the same basis as amendments filed by U.S. space station applicants for purposes of determining the order in which the petitions will be considered relative to pending applications and petitions.
(f) A non-U.S.-licensed space station operator that has been granted access to the United States market pursuant to a declaratory ruling may modify its U.S. operations under the procedures set forth in §§ 25.117(d), (h), and (j) and 25.118(e).
(g) A non-U.S.-licensed satellite operator that acquires control of a non-U.S.-licensed space station that has been permitted to serve the United States must notify the Commission within 30 days after consummation of the transaction so that the Commission can afford interested parties an opportunity to comment on whether the transaction affected any of the considerations we made when we allowed the satellite operator to enter the U.S. market. A non-U.S.-licensed satellite that has been transferred to new owners may continue to provide service in the United States unless and until the Commission determines otherwise. If the transferee or assignee is not licensed by, or seeking a license from, a country that is a member of the World Trade Organization for services covered under the World Trade Organization Basic Telecommunications Agreement, the non-U.S.-licensed satellite operator will be required to make the showing described in paragraph (a) of this section.
47 C.F.R. § 25.138 Earth Stations in the 3.7-4.2 GHz band.
Link to an amendment published at 91 FR 48741, July 31, 2026.
(a)-(b) [Reserved]
(c) Fixed and temporary fixed earth stations operating in the 3.7-4.16 GHz portion of the band within CONUS will be protected from interference by licensees in the 3.7 GHz Service subject to the deadlines set forth in § 27.1412 of this chapter and are eligible for transition so long as they:
(1) Were operational as of April 19, 2018 and continue to be operational;
(2) Were licensed or registered (or had a pending application for license or registration) in the IBFS (now ICFS) database on November 7, 2018; and
(3) Timely certified the accuracy of the information on file with the Commission by May 28, 2019.
(d) Fixed and temporary earth station licenses and registrations that meet the criteria in paragraph (c) of this section may be renewed or modified to maintain operations in the 4.16-4.2 GHz band.
(e) Applications for new, modified, or renewed licenses and registrations for earth stations outside CONUS operating in the 3.7-4.2 GHz band will continue to be accepted.
47 C.F.R. § 25.139 NGSO FSS coordination and information sharing between MVDDS licensees in the 12.2 GHz to 12.7 GHz band.
(a) NGSO FSS licensees shall maintain a subscriber database in a format that can be readily shared with MVDDS licensees for the purpose of determining compliance with the MVDDS transmitting antenna spacing requirement relating to qualifying existing NGSO FSS subscriber receivers set forth in § 101.129 of this chapter. This information shall not be used for purposes other than set forth in § 101.129 of this chapter. Only sufficient information to determine compliance with § 101.129 of this chapter is required.
(b) Within ten business days of receiving notification of the location of a proposed MVDDS transmitting antenna, the NGSO FSS licensee shall provide sufficient information from the database to enable the MVDDS licensee to determine whether the proposed MVDDS transmitting site meets the minimum spacing requirement.
(c) If the location of the proposed MVDDS transmitting antenna site does not meet the separation requirements of § 101.129 of this chapter, then the NGSO FSS licensee shall also indicate to the MVDDS licensee within the same ten day period specified in paragraph (b) of this section whether the proposed MVDDS transmitting site is acceptable at the proposed location.
(d) Nothing in this section shall preclude NGSO FSS and MVDDS licensees from entering into an agreement to accept MVDDS transmitting antenna locations that are shorter-spaced from existing NGSO FSS subscriber receivers than the distance set forth in § 101.129 of this chapter.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-47.xmlFetched: 7/26/2026
