§ 53-13 — Engineering requirements
Code of the City of Chandler (Supp. No. 80: codified through Ordinance No. 5171, adopted July 13, 2026) · Chandler City Code § 53-13
Corpus is an independent public-information project, not the official City of Chandler website. Stable reference: corpuslaw.us/code/bd96df8e-728b-4d82-8e70-9d2214154f1f
53-13. - Engineering requirements.
The following engineering requirements shall apply to all public reclaimed waterline extensions and onsite reclaimed water delivery systems: A. The developer causing extension of a reclaimed waterline shall locate it in City rights-of-way or easements and shall pay in full, less approved City participation as provided above, the engineering, construction and inspection costs of the lines and appurtenances. B. Plans and specifications shall be prepared in accordance with appropriate standards as established by the City Engineer. C. Each lot or parcel of land to be served with reclaimed water shall abut a reclaimed water main. D. All lines shall be sized in accordance with the latest reclaimed water system master plan, except that the City Engineer reserves the right to increase or decrease the diameter of any and all mains described in the plan when requirements so dictate. E. In all developments, such as subdivisions, multifamily tracts, commercial centers, shopping centers, golf courses, parks, industrial or other similar developments, the developer shall furnish and install, to City specifications, all reclaimed water mains, service connections, valves, fittings, storage structures, turnout structures and appurtenances within the boundary of the development as well as the streets bounding the tracts, and make reclaimed waterline extensions as determined necessary by the City Engineer. For developments that have irrigation infrastructure in place as of July 1, 2000, the City Engineer, upon receipt of a written request from a developer, may elect to construct and finance a turnout structure to permit that development to convert to the use of reclaimed water for irrigation purposes. In such cases the developer shall be required to enter into a contract for repayment of the costs of constructing the turnout over a period not to exceed ten (10) years at an interest rate of eight (8) percent compounded on a monthly basis. Payments shall be made by the developer on a monthly basis. F. All main line valves shall use MAG Standard Detail 391-1 Type A or C valve box with a square or rectangular frame and cover with the words "Reclaimed Water" in raised letters on the cover. Debri caps (MAG Standard Detail 392) shall be installed on each valve. G. All reclaimed water distribution systems shall be clearly identified in accordance with MAG Specifications Section 616. All subsurface piping and fixtures shall be installed with purple pipe or by wrapping the pipe with Christy's polyethylene encasement (polywrap) or equal and by marking above ground parts, including valves, valve boxes and covers, controllers, piping, hose bibs, and other outlets purple. H. Access to the developers reclaimed water distribution system controller box shall be by key. I. The engineering requirements set forth herein are intended to supplement rather than supercede other applicable local county, state and federal requirements and, in the case of conflict, the more stringent requirement shall apply.
(Ord. No. 3173, 8-10-00)
Ask a question about Chandler law
Corpus searches the Chandler sections it holds and shows the ones that match, with their citations. Free, no sign-in.