Sec. 19-20. - Variance procedure.
(a) Any applicant for a permit may apply for a variance from the requirements of this chapter. Except as may be otherwise provided in subsection 19-22(f), a variance may be sought only on the basis that the imposition of the requirements of this chapter for the issuance of a permit to the applicant constitutes an exceptional hardship. (b) An applicant may file a request for variance at any time. However, no variance may be granted for development on vacant land in a floodway, and no variance may be granted after an applicant has complied with the provisions of this chapter and a permit has been issued. An applicant shall file the application for a variance on a written form to be supplied by the city engineer, and shall include the following information, at a minimum: (1) The particular requirement from which a variance is sought; (2) The nature of the hardship presented by the imposition of the requirements, including specific information on the uniqueness of the property for which the variance is requested; (3) The proposed alternative method or procedure to be utilized in lieu of the required method, practice or procedure that is proposed; (4) The effect of the proposed construction on flood levels within the city; (5) The estimated cost in dollars of complying with the requirement; (6) The estimated cost in dollars of construction by the proposed alternative method of procedure; (7) The size, in acres, of the land area or the number of lots involved in the permit application; and (8) The existence of lots contiguous to or surrounding the land area which are located below the 0.2 percent chance flood level. (c) In addition, the applicant shall submit a verified acknowledgment stating: (1) The granting of a variance for construction below the flood level may result in increased flood insurance rates commensurate with the increased risk resulting from the reduced lowest floor elevation; and (2) Construction below the 0.2 percent chance flood level increases risks to life and property to the applicant and the residents of this city and the surrounding area.
(Ord. No. 2018-258, § 2(Exh. A), 4-4-2018)
Ask a question about Houston law
Corpus searches the Houston sections it holds and shows the ones that match, with their citations. Free, no sign-in.