For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-361 — Building sanitary sewers

Municipal Code, City of Green Bay, Wisconsin (Supp. 10: codified through Ordinance No. 11-26, enacted July 21, 2026 (online updated October 12, 2026)) · Green Bay Municipal Code § 8-361

Corpus is an independent public-information project, not the official City of Green Bay website. Stable reference: corpuslaw.us/code/be735cc5-35d4-4324-9958-4101d1687bb9

Sec. 8-361. - Building sanitary sewers.

(a) Required. Every building shall have a separate and independent connection with a public main sanitary sewer, private onsite water treatment system, or private main sanitary sewer. Each private main sanitary sewer shall conform to City standards for public sewers and shall be approved by a Plumbing Inspector. Manholes shall be located not less than 25 feet from any building. (b) Exemption. Upon proof of the following, the Director may grant an exemption from the requirements of subsection (a) of this section: (1) The building is zoned Low Density Residential (R1) and is located within the City's Urban Expansion District. (2) The purpose of the exemption is to retrofit existing infrastructure that has been installed but not dedicated to the public and/or accepted as public right-of-way. (3) An easement exists on the face of the recorded subdivision plat, certified survey map (CSM) or replat which addresses the location of any shared lateral and identifies the ownership and maintenance responsibilities for the shared lateral from the common point of connection back to the sanitary sewer main. (4) An exemption is necessary to achieve compliance with any other requirement that the Director deems necessary. (c) Piping. All building sanitary sewer piping extending from a public sewer service lateral or other disposal terminal to within three feet to five feet of the outside foundation walls shall be of cast iron or vitrified clay. Such disposal terminal shall be the end of the sewer service lateral or, in the event no lateral has been installed, the City sewer main. Building sanitary sewer connections to a private main sanitary sewer shall be of cast iron pipe or vitrified clay pipe to within three feet to five feet outside of the foundation wall. (d) Unconnected pipes to be closed off. The ends of all sanitary sewer pipes not immediately connected shall be securely closed with a cap or plug to prevent the introduction of sand, earth, or drainage from an excavation. (e) Replacement. When it becomes necessary to replace any building sewer because of stoppages, such sewer shall be replaced in its full length with approved materials. (f) Sewers carrying harmful discharges. No person shall connect to a public sewer any sewer through which is discharged any substance likely to cause undue corrosion, obstruction, nuisance, explosion, or interference with sewage treatment processes. (g) When buildings are razed or moved. When a building is moved or demolished, the building sewer shall be located at a point outside the foundation walls and shall be sealed off. The plug or seal shall not be covered until approval has been given by a Plumbing Inspector.

(Ord. No. 13-24, § 1, 7-30-2024)

Ask a question about Green Bay law

Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.