4-20-6. - Public Right of Way Permit and Contractor License Fees.
(a) An applicant for a contractor in the public right of way license shall pay $201 per year. (b) An applicant for a permit for construction in the public right of way, for improvements which are, or will become, through construction acceptance, owned and operated by the city, shall pay the following fees: (1) An applicant shall pay permit fees for all other construction work, including excavation, as follows: a base permit fee of $98, and: (A) $94 for one linear foot through fifty feet plus $1.12 for each linear foot over fifty linear feet of existing or new sidewalks, trails, curbwalks, and curb and gutter to be constructed and inspected, repaired, or replaced; (B) $94 for one linear foot through one hundred feet plus $0.87 per linear foot over one hundred feet of trench excavated or bored and inspected; (C) $94 for one linear foot through one hundred feet plus $0.87 per linear foot over one hundred feet of pipeline to be installed and inspected; (D) $144 for one square yard through three hundred square yards plus $0.41 per square yard over three hundred square yards of concrete or asphalt to be constructed and inspected for new or overlaid street, parking, or alley sections; (E) $144 for one square foot through three hundred square feet plus $0.41 per square foot over three hundred square feet of concrete or asphalt to be constructed and inspected for the patching (repair) of street, parking, or alley sections; (F) $24 per cubic yard, with a minimum fee of $237 of structural concrete, masonry, or stonework to be installed and inspected for retaining walls, box culverts, wing walls, drop structures, and other activities not covered by the fees above; and (G) The following fees for each appurtenance to be installed and inspected:

(2) An applicant for a permit for placement in the right of way of temporary construction equipment or materials, including but not limited to construction dumpsters, construction fencing, heavy equipment (not including cranes), scaffolding or covered walkways, for a single project on adjacent private property, not in association with the construction of public improvements within the right of way, shall pay the base permit fee plus $94. For cranes, this fee shall be $250. Such a permit shall be approved only when the applicant can demonstrate that placement of the temporary construction equipment or materials outside of the right of way is not feasible and shall be effective for a time period not to exceed the more restrictive of: a) the authorized time frame in the permit conditions, or b) thirty days. After the authorized time frame or thirty days have expired, the applicant shall either remove the temporary construction equipment or materials or obtain a new permit to allow the temporary construction equipment or materials to remain in the right of way for the duration of the new permit, which shall not exceed thirty days. (c) An applicant for a permit for construction in the public right of way of improvements to utilities which are not owned or operated by the city shall pay the following fees: (1) An applicant shall pay permit fees for all construction work, including excavation, as follows: a base permit fee of $159 plus any of the following that apply: (A) $94 for one foot through fifty feet plus $1.12 for each linear foot of existing or new sidewalks, trails, curbwalks, and curb and gutter over fifty linear feet to be constructed and inspected, repaired, or replaced; (B) $94 for one foot through one hundred feet plus $0.87 per linear foot over one hundred feet of trench excavated or bored and inspected; (C) $144 for one square yard through three hundred square yards plus $0.41 per square yard over three hundred square yards of concrete/asphalt to be constructed and inspected for new or overlaid street, parking, or alley sections; (D) $144 for one square foot through three hundred square feet plus $0.41 per square foot over three hundred square feet of concrete to be constructed and inspected for patching (repair) of street, parking, or alley sections; (E) $24 per cubic yard, with a minimum fee of $237, of structural concrete, masonry, or stonework to be installed and inspected for retaining walls, box culverts, wing walls, drop structures, and other activities not covered by the above fees; and (F) $47 plus $14 for each appurtenance over three appurtenances to be installed and inspected. (2) For the purposes of this subsection, appurtenance means any part of a utility system other than pipe, conduit, cable, or wire. (d) An applicant for a utility permit shall pay the following additional fee:
| | | | --- | --- | | Permit | Fee | | Utility construction | $78 |
(e) The fees herein prescribed shall not be prorated. (f) The reinspection fee is $94 per hour with a one-hour minimum. (g) The after-hours inspection fee is $123 per hour, with a two-hour minimum. (h) The fee for any permit issued after construction has begun in the public right of way shall be twice the amount of each fee listed above. (i) An applicant for a permit to excavate an area in the pavement of any public street or alley with surface paving less than three years old as set forth in Section 8-5-13, "Construction and Restoration Standards for Newly Constructed or Overlayed Streets," B.R.C. 1981, shall pay an impact fee for loss of useful pavement life of $4 per square foot of paved surface area removed during excavation. (j) An applicant for a permit to work in the public right of way that includes closure or alteration of a transportation facility for more than twenty-four hours and for which a traffic control plan is required pursuant to Section 8-5-10, "Temporary Traffic Control," B.R.C. 1981, shall pay a traffic control inspection fee as follows: (1) $196 for a duration of one week or less. (2) $391 per month for a duration greater than one week. (k) An applicant for a permit to construct a stormwater detention or stormwater quality facility required by Paragraph 11-5-6(b)(4), B.R.C. 1981, shall pay a fee of $831 per facility. (l) An applicant for a permit to connect to the stormwater utility system in accordance with Section 11-5-4, "Connections to the Stormwater Utility System," B.R.C. 1981, shall pay: (1) A permit fee of $147 per connection. (2) An inspection fee (first two inspections inclusive) of $196. Each subsequent inspection is $109. Ordinance Nos. 4866 (1984); 4946 (1985); 5012 (1986); 5599 (1993); 5676 (1994); 5835 (1996); 5919 (1997); 7439 (2005); 7495 (2006); 7564 (2007); 7629 (2008); 8323 (2019); 8727 (2026)