For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.170.220 — Erosion Control

Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.170.220

Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/bec1dd78-45f3-46cf-93f1-7f37e7fc092d

22.170.220 - Erosion Control

A. Methods. Grading and other land disturbing activity shall comply with the applicable requirements set forth in SMC Title 22, Subtitle VIII, the Stormwater Code and rules promulgated thereunder. Devices or procedures for erosion control shall be initiated or installed prior to commencing grading operations when technically feasible, and in any case as soon thereafter as is technically feasible, and shall be maintained or altered to prevent erosion and sediment transport from the site according to the means and methods of construction activity. B. Exposure. Grading and other land disturbing activity shall be conducted so as to expose the smallest practical area of soil to erosion for the least possible time. Grading and other land disturbing activity shall comply with the applicable requirements for exposed soils, including best management practices, promulgated pursuant to SMC Title 22, Subtitle VIII, the Stormwater Code. C. Project Completion. Before the completion of the project, all exposed soils that have been disturbed shall be permanently stabilized. Methods such as permanent seeding, planting, and sodding may be specified by rules promulgated by the Director.

(Ord. 123107, § 1, 2009.)

Ask a question about Seattle law

Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.