For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.03.0622 — Sewer Construction Regulations

Spokane Municipal Code; partial · SMC 13.03.0622 · Effective

Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/bf30b0f9-7a3f-45c3-abd6-bcd595840708

Section 13.03.0622 Sewer Construction Regulations

A. The Director of the Development Services Center prepares and updates “Regulations Governing Sewer Construction in the City of Spokane.” 1. Copies of the regulations may be obtained from the Engineering Services Director, or it can be located on the City of Spokane website. B. The regulations contain specifications relative to materials, construction, procedure, inspection, backfilling and responsibilities in sewer installations. The permissibility of specific installations not fully covered by the regulations, General Special Provisions, or Design Standards and Standard Plans are determined by the Wastewater Superintendent at the time of occurrence in accordance with the spirit and purpose of the regulations. C. Revision of or addition to the regulations may be made by the Engineering Services Director as specified in SMC 13.03.0902.

Date Passed: Monday, December 8, 2025 Effective Date: Sunday, January 18, 2026 ORD C36776 Section 41

Ask a question about Spokane law

Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.