For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 509.540 — Flared joints required

Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances § 509.540

Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/bf7106c5-f8e8-4ab8-b433-1671e9f33c59

509.540. - Flared joints required.

Service line joints should be minimized when possible. All connections to copper tubing between the water main and the water meter shall be mechanical flared joints, except, to comply with the Minnesota plumbing code, one (1) brazed joint with a wrought copper fitting will be permitted on service line tubing if the joint is made inside the foundation of a building and the joint must be located under a concrete slab. A brazed joint shall be left exposed and pressurized for inspection by a City of Minneapolis Plumbing Inspector prior to being backfilled.

(Ord. No. 2022-024, § 4, 5-26-22; Ord. No. 2025-014, § 6, 2-27-25)

Ask a question about Minneapolis law

Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.