Section 1305. - Standards for blasting permits.
The requirements established within this section apply to the blasting area as depicted in the site plan submitted by the permittee as part of his application. A permittee shall perform both pre-blast and post-blast surveys upon request. A holder of a blasting permit shall adhere to the following: A. Permittees shall perform pre-blast surveys upon the request of the affected property owner or his representative. The pre-blast survey shall consist of conducting or providing for inspections on structures within the blasting area. The pre-blast survey shall document any damage to and other physical factors of the structure that could reasonably be affected by the blasting. B. The post-blast survey shall consist of conducting or providing for inspections of structures within the pre-blast survey area. The post-blast survey shall document any changes to or differences in the surveyed structure from the pre-blast survey. Permittees shall perform post-blast surveys when requested by persons previously having had a pre-blast survey performed under the same blasting permit. The post-blast survey shall be requested within thirty (30) days after blasting has been completed. C. The cost of the pre-blast and post-blast surveys shall be paid by the permittee directly to the individual or organization which is hired to perform the surveys. Pre-blast and post-blast surveys shall be performed by an individual or organization who has expertise in the assessment of the impact of blasting on structures. The Director shall develop administrative regulations for the approval of inspectors and maintain a list of all such approved inspectors. D. At the beginning of each blasting project the permittee shall perform test blasting to determine the amount of blasting charge required to limit the peak particle velocity to two (2.0) inches per second at the closest structure. E. The permittee shall abide by the standards required in the most current BOCA National Fire Prevention Code ("Fire Prevention Code") published by the Building Officials and Code Administrators International, Inc. F. The permittee shall abide by the State of Oklahoma Explosives and Blasting Regulation Act and implementing regulations thereof. G. Except as otherwise authorized herein, the allowable ground vibration and airblast levels resulting from the detonation of explosives are: 1. Ground Vibration. Maximum peak particle velocity for ground vibration shall not exceed two (2.0) inches per second at the closest structure. A seismograph record shall be required for each blast. The maximum peak particle velocity shall be the largest peak particle velocity exhibited by three (3) mutually perpendicular components. 2. Airblast. Levels shall not exceed, at anytime, the prescribed limits of the Oklahoma Explosives and Blasting Regulation Act and implementing regulations thereof. H. Flyrock. When blasting operations are performed pursuant to a permit issued under this chapter within three hundred (300) feet of any structure, railway or highway, the blast shall be designed to prevent flyrock from being thrown onto the structure, railway or highway. The blaster shall comply with the Oklahoma Explosives and Blasting Regulation Act and implementing regulations thereof regarding flyrock. I. A certified blaster and the Director shall be present during the firing of all blasts. J. The permittee shall notify all property owners in the blasting area that a pre-blast survey is available to them. This notice shall be sent by certified mail, return receipt requested, at least ten (10) working days prior to the anticipated start of the blasting. The notice shall explain that a pre-blast survey is available, and give instructions for scheduling the survey. The notice shall state the anticipated dates of the blasting and specify the blasting location. The certified mail receipts stamped by the U.S. Postal Service or an affidavit wherein the permittee swears that the notification required by this section has been made and the list of property owners in the blasting area from County tax records shall be furnished to the Director as proof of compliance with this requirement. 1. If the dates of blasting are changed following the notice required by this section, then a notice which specifies the revised dates of blasting shall be mailed to property owners in the blasting area in sufficient time to provide them forty-eight (48) hours notice of the blasting. 2. The permittee shall also give notice of his intent to blast by posting a notice at the blasting site at least seven (7) calendar days before the date of the proposed blasting. The notice shall state: a. The dates and anticipated duration of blasting, and place of the proposed blasting; and b. Who will conduct the proposed blasting, identified by the name of a contact person, a physical address and a telephone number; and c. Instructions on how the reader can contact the blaster and the Director, including a physical address and a telephone number. K. Except as otherwise authorized by the Director for good cause shown, all blasting activities shall be limited to daylight hours, but no later than 7:00 p.m., Monday through Saturday. L. The permittee shall monitor any blasting that occurs within the blasting area. Such monitoring must be overseen by a certified blaster and shall measure blast-induced vibration by means of an instrument that senses and records particle velocity in three (3) mutually perpendicular axes. Sound levels shall also be recorded. Violation of the ground vibrations or airblast levels shall be reported to the Director immediately. M. The Director may conduct tests and shall observe any authorized blasting operations. N. The permittee shall maintain a record of each blast. All records shall be maintained in conformance with the Oklahoma Explosives and Blasting Regulation Act and implementing regulations thereof. In addition, the permittee shall maintain evidence of the notifications required by this section. These records shall be available for inspection by the Director for a period of three (3) years following expiration of the blasting permit. O. The permittee shall keep the blasting permit under file at the site or on display at all times where the blasting operation is located and shall make such permit readily available for inspection by the Director.
(Ord. No. 19947)
Ask a question about Tulsa law
Corpus searches the Tulsa sections it holds and shows the ones that match, with their citations. Free, no sign-in.