§ 32-99 — Construction obligations
Code of Ordinances of the City of Pasadena, Texas (Supp. No. 33, Update 2: codified through Ordinance No. 2026-143, enacted September 1, 2026) · Pasadena City Code § 32-99
Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/bfc0e090-6a15-4010-97ef-2d63aa33dace
Sec. 32-99. - Construction obligations.
A person is subject to reasonable police power regulation of the city to manage its public rights-of-way in connection with the excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of facilities in the public rights-of-way, pursuant to the city's rights as a custodian of public property based upon the city's historic rights under state and federal laws. Such regulations include, but are not limited to, the following: (a) At the city's request, a person shall furnish the city accurate and complete information relating to the excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of facilities performed by the person in the public rights-of-way. (b) A person may be required to place certain facilities within the public rights-of-way underground according to applicable city requirements, in accordance with the city's design manual, and consistent with the requirements applicable to a designated historic district or design district, unless the person makes a compelling demonstration that, in any specific instance, this requirement is not reasonable, feasible or equally applicable to other similar users of the public rights-of-way. (1) The undergrounding of facilities is encouraged. In any event, facilities shall be installed underground where existing utilities are already underground. A minimum of four (4) feet of horizontal and (2) feet of vertical distance shall be maintained between the City of Pasadena utilities and facilities and if this distance cannot be maintained, a request for variance can be submitted to the director. A variance will be considered if it will not adversely effect public safety or cause the city to incur excessive maintenance costs. The utility owning the underground facilities shall make a reasonable determination as to whether space is available to accommodate the new facilities. A negative determination shall not relieve the person of the responsibility to underground its facilities in underground utility areas. To the degree reasonably feasible previously installed aerial facilities shall be placed underground in concert, and on a cost-sharing basis, with other utilities when such other utilities convert from aerial to underground construction. (2) Underground conduits and ducts shall be installed in the public rights-of-way between the adjacent property line and the curb line unless otherwise directed by the city. (3) Conduits and ducts shall be installed parallel with the curb line and cross the public rights-of-way perpendicular to the public rights-of-way centerline unless otherwise directed by the city. (4) Ducts and conduits shall be installed by trenchless excavation or directional boring when placing these facilities under paved public rights-of-way or a driveway crossing to avoid motor vehicle interruptions, unless otherwise directed by the city. (c) A person shall perform excavations and other construction in the public rights-of-way in accordance with all applicable city requirements, including the obligation to use trenchless technology whenever commercially economical and practical and consistent with obligations on other similar users of the public right-of-way. The city shall waive the requirement of trenchless technology if it determines that, based upon information provided to the city by the person, the particular field conditions such as known or unknown or unknown underground conditions that may necessitate open cut warrant a waiver. All excavations and other construction in the public rights-of-way shall be conducted so as to minimize interference with the use of public and private property. Any plant or facility placed within the public rights-of-way which is suspended in any manner above ground shall either be placed on existing poles or equipment or be suspended at a height not less than twenty-two (22) feet above ground level, unless otherwise approved by the director, but in no event less than fifteen (15) feet, except to the extent state law controls. A person shall follow all reasonable construction directions given by the city in order to minimize any such interference. (d) (1) Except as otherwise provided in subsection (d)(3) below, a person must obtain a permit, as reasonably required by applicable city codes, including section 39-93 (requiring a permit from the traffic and transportation department), seventy-two (72) hours prior to any excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of the person's facilities, which seventy-two (72) hours may be waived or altered by the city for good cause shown by the applicant. All permit applications shall be accompanied by the certification of a professional engineer licensed in Texas that the drawings, plans and specifications submitted with the application comply with applicable technical codes, rules and regulations when required by state law. A Person shall submit a traffic control plan signed and sealed by a professional engineer licensed in the state of Texas at the director's discretion based upon traffic density, duration for street closure and public safety. (2) Bonding will be required as in subsection 32-99(m) below, and insurance as in section 32-104. (3) A construction permit is not required for routine maintenance that does not require excavation of the public rights-of-way or which does not block traffic lanes or sidewalks during peak traffic periods between 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:30 p.m. on weekdays, or for more than three hours during any non-peak traffic period. The failure of the person to request and obtain a permit from the city prior to performing any of the above listed activities in, on or over any public right-of-way, except in an emergency as provided for in subsection 32-99(j) below, will subject the person to a stop-work order from the city and enforcement action pursuant to the city's Code of Ordinances. If the person fails to act upon any permit within one hundred twenty (120) calendar days of issuance, the permit shall become invalid unless extended by the city upon a showing of good cause. Upon expiration of a permit, a person shall be required to obtain another permit pursuant to the requirements of this article. (4) A person shall furnish the director with construction plans, specifications and maps using the standard format adopted by the department of public works including the location and proposed routing of new construction or reconstruction at least three (3) business days before beginning construction or reconstruction that involves an alteration to the surface or subsurface of the public rights-of-way, unless otherwise approved by the director. A person may not begin construction until the location of new facilities and proposed routing of the new construction or reconstruction and all required plans and specifications have been approved in writing by the city, which approval will not be unreasonably withheld, taking due consideration of the surrounding area and alternative locations for the facilities and routing. (5) These construction plans shall show all features within the public rights-of-way that would affect the placement of the proposed facilities such as, but not limited to, existing underground and aerial wires or conduits, ducts, poles, wires, pipes, sewer, water lines, and cables as well as their ownership; traffic signal and street light poles; fire hydrants; driveways; curbs, inlets and drains; sidewalks, wheelchair ramps; and trees and large shrubs. Drawings shall be drawn to an appropriate scale of no larger than one (1) inch equals fifty (50) feet using the standard format adopted by the public works department. State plan coordinates shall be shown for benchmarks, curb lines, and structures. Drawings shall show horizontal dimensions from the curb line and elevations. If typicals are used, they shall reference the station numbers for which they are to be applied. Traffic control plans shall be in conformance with the latest revision of the Texas Manual on Uniform Traffic Control Devices. (6) A person shall use its best efforts to coordinate joint trenching with any other persons and/or public utilities which may be constructed in and along the same public-rights-of-way in a time frame reasonably similar to the persons construction time table. The department of public works may mandate such coordination to the fullest extent allowed by law. (7) To the extent known, plans for ongoing repair, maintenance, and improvements which involve cutting into paved city roads or streets shall be submitted to the department of public works on an annual basis, no later than April 1 of each year, and updated based upon any changes. This does not require any proprietary information, such as equipment or customer specific information. Such information may be designated confidential, and to the extent allowed by law, will be kept confidential by the city. Alternatively, a person may meet with the appropriate representative of public works each calendar quarter to provide such plans to the extent known. (8) Once all required permits are issued, the departments of public works and the department of traffic and transportation shall be notified in writing or via e-mail or facsimile at least twenty-four (24) hours in advance that construction in the public rights-of-way is ready to proceed by a person or its representative. Information signs (at least 3 ft. × 3 ft. in size) stating the identity of the person doing the work, their telephone number, shall be placed at the location where construction is to occur forty-eight (48) hours prior to the beginning of work in the public rights-of-way and shall continue to be posted at the location during the entire time the work is occurring and/or until permanent repairs are completed. (9) Person owning a gas line, high pressure hazardous material, petroleum pipeline or facilities shall provide the area residents and businesses located within one-half (½) mile area at least ten (10) calendar days written notice prior to start of any construction and/or maintenance, or other substantial activity. A Pasadena Police Officer is required to be present during the time of construction and/or maintenance. This requirement does not apply to emergencies, routine inspections and maintenance, by the person, its agents, employees or contractors on person's pipeline(s), gas lines or facilities. (10) Erosion control measures and advance warning signs, markers, cones, and barricades must be in place before work begins. A person may be required to show proof of engineered plans relating to stormwater and erosion when applicable or a letter stating a person is not required to provide such plans. A person shall be responsible for storm water management erosion control that complies with city, state and federal guidelines, as applicable. (11) Lane closures on major thoroughfares will be limited to between 9:00 a.m. and 4:00 p.m. unless the traffic and transportation department grants prior approval. All lane closures shall comply with the Texas Manual on Uniform Traffic Control Devices for Streets and Highways. Arrow boards will be required on lane closures with all barricades, advance warning signs, and thirty-six (36) inches reflector cones placed according to the specifications of the city. Excepting emergency conditions, working hours in the public rights-of-way are limited to the hours between 7:00 a.m. to 6:00 p.m. Monday through Friday, work to be performed after 6:00 p.m. on Monday through Friday or on Saturday must be approved by the traffic and transportation department in advance. Directional boring is permitted only Monday through Friday 7:00 a.m. to 6:00 p.m. No work in the public rights-of-way shall be performed except for emergencies, on Sunday's or on holidays. (12) Without affecting the legal relationship between person and its contractors, a person is responsible for the workmanship and any damages by a contractor or subcontractor. (13) If additional poles and existing aerial utility route are required, a Person shall negotiate with the utility company for the installation of the needed poles in accordance with existing statutes and regulations. (e) Within fourteen (14) days of completion of excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of facilities or other work in the public rights-of-way, a person shall temporarily restore and repair the public rights-of-way in accordance with section 32-99 of the Code of the City of Pasadena, any other applicable sections of the Code, and most current revision of the city's design criteria manual. Within thirty (30) calendar days after completion of work in the public rights-of-way, the person shall permanently restore, replace, relay and/or repair the surface, base, curbs, drainage systems, irrigation systems, landscape treatment or other city facilities and infrastructure located on, in or under any public rights-of-way that has been excavated, altered or damaged by reason of the excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of the person's facilities in accordance with existing standards of the city in effect at the time of the work. Upon a showing of good cause, the city may at its sole discretion extend the time for restoration and repair of the public rights-of-way under this subsection. Unless the person provides a recent dated photograph or a video tape of the public rights-of-way before the construction, the condition of the public rights-of-way before construction should be presumed in good condition, subject only to reasonable wear and tear, as determined by the director. Whenever a person shall disturb or destroy any right-of-way markers or monuments, it shall restore the same within thirty (30) days after construction has ceased. A person shall furnish three (3) sets of drawings, blueline or blackline, detailing the restored monumentation. state plane coordinates shall be shown for all monumentation (existing or restored). The drawings shall be signed (original signature), sealed and certified, by a registered professional land surveyor, and delivered to the director of public works for approval, no later than thirty (30) days after construction has ceased. (f) Upon failure of a Person to perform any such repair or replacement work after five (5) days written notice has been given by the city to the person, and in the event repairs have not been initiated during such five day period, the city may repair such portion of the public rights-of-way as may have been disturbed by the person, its contractors or agents. The city may, at its discretion, for good cause, alter the five day period. Upon receipt of an invoice from the city, the person shall reimburse the city for the costs so incurred within thirty (30) calendar days from the date of the city invoice. Failure to comply with the provisions of this article may also result in enforcement action per section 32-98 of this chapter. (g) Should the director reasonably determine, within one year from the date of the completion of the repair work, that the surface, base, curbs, drainage systems, irrigation systems, landscape treatment or other city facilities and infrastructure located on, in or under any public rights-of-way requires additional restoration, replacement or repair work to meet existing standards of the city, a person shall perform such additional restoration, replacement or repair work to the satisfaction of the city, subject to all city remedies as provided herein and within five (5) days of written notice from the director stating the repairs necessary. (h) Notwithstanding the foregoing in subsection 32-99(g), if the director determines that the failure of a person to properly repair or restore the public rights-of-way constitutes a safety hazard to the public, the city may undertake emergency repairs and restoration efforts, after emergency notice has been provided, to the extent reasonable under the circumstances, and the person failed to respond within a reasonable time specified by the city. Upon receipt of an invoice from the city, a person shall promptly reimburse the city for all costs incurred by the city within thirty (30) calendar days from the date of the city invoice. (i) If the director declares an emergency with regard to the health and safety of the citizens and requests by written notice the removal or abatement of facilities, a person shall remove or abate the person's facilities by the deadline provided in the director's request. The person and the city shall cooperate to the extent possible to assure continuity of service. If the person, after notice, fails or refuses to act, the city may remove or abate the facility, at the sole cost and expense of the person, without paying compensation to the person and without the city incurring liability for damages. (j) Except in the case of customer service interruptions and imminent harm to property or persons ("emergency conditions"), a person may not excavate the pavement of a street or public rights-of-way without first complying with city requirements. In the event of an emergency condition before the excavation is initiated, the city department of public works shall be notified by the person at the twenty-four-hour city response telephone number. The person shall also notify any other city, state, or federal authority required under law to be notified. The person shall apply for a permit for the excavation within twenty-four hours after the initiation of the excavation or, if the city offices are then closed, within twenty-four hours after the offices of the city are first opened subsequent to the initiation of the excavation. The person shall comply with the requirements of city standards and of this article for the restoration, replacement or repair of the public rights-of-way. (k) Before excavation activities are initiated, written door hanger notification will be required to all area residents and businesses within one-fourth (¼) mile that may be impacted by such activities at least twenty-four (24) hours prior to start of such activities. A copy of the notification shall also be provided to the city secretary and the director. (l) Within one hundred twenty (120) days of completion of each new permitted section of a person's facilities, the person shall supply the city with a complete set of "as-built" drawings for the segment, but excluding customer specific, proprietary or confidential information and as reasonably prescribed by the city as is described below, and as may be allowed by law. Such "as-built" maps may be corrected and revised construction plans. In the event the facilities were built as specified in the originally submitted plans, the person may certify to the city that there were no changes. In case "as built" drawings are not available, the city may, at its discretion, accept in lieu of "as-built" drawings, any reasonable alternative which provides adequate information as to the vertical depth, linear location and size of facilities in the public rights-of-way, which may include direct on-line access to such information. To the extent the person's customary as-built format will confirm without economic impracticability, a person shall furnish the city "as-built" drawings as follows: drawings shall show ownership of conduits, ducts, poles, cables, and any other facilities placed within the public rights-of-way. Drawings shall be drawn to a scale of 1 in. equals 20 ft. on 24 in. × 36 in. sheets and 1 in. equals 40 ft. on 11 in. × 17 in. sheets using the standard format adopted by the department of public works. A person shall provide one set of all such drawings on diskette in Autocad or Microstation format drawn to full scale and one set of blue or blacklined "as-built" drawings on vellum or Mylar to the director of the department of public works and one set of drawings and diskettes to the director of the traffic and transportation department. State plane coordinates shall be shown for bench marks, curb lines, and structures. Drawings shall show horizontal dimensions from the curb line and elevations. All persons who have facilities in the public rights-of-way existing as of the date of this article shall register with the city as provided in subsection 32-96(d). Those (persons) who have not provided "as-built" drawings shall do so within the same period of time, unless the Person demonstrates an economic impracticality to provide such "as-built" drawings in the above format. The city may waive such "as-built" drawings as to existing facilities, for good cause. The "as-built" drawings submitted by the person shall be integrated into the city's GIS system within ninety (90) days from the date they are received and no permits shall be issued during that period of time except for emergencies. If "as-built" drawings submitted under this section include information expressly designated by the person as a trade secret or other confidential proprietary information protected from disclosure by state or federal law, the director may not disclose that information to the public without the consent of the person, unless otherwise required by an opinion of the Attorney General pursuant to the Texas Open Records Act, as amended, or by a court having jurisdiction of the matter pursuant to applicable law or as otherwise required by law. This subsection may not be construed to authorize a person to designate all matters as confidential or as trade secrets. (m) Except as to CVSPs to the extent modified by Texas Utilities Code, Chapter 66, the director shall require reasonable bonding requirements of a person, as are required of other entities that place facilities in the public rights-of-way. Such bonding amounts will be reasonably determined by the director depending on several factors as to public safety and risk of harm to persons and property. Such factors include: (1) the nature of the construction project (overhead, trenchless, open trench), (2) type of facility (gas, electric, water, telecommunications, cable, fiber), (3) past construction history of person in the city as to any damage claims, repairs and timeliness of construction. The city may in a non-discriminatory manner waive or reduce the amount of the bond in the event the person provides written documentation as to reserves available to compensate the city for damages, and has a two-year history of no claims, or damages to city property by the city, or of prompt payment on such claims. (n) In determining whether any requirement under this section is unreasonable or unfeasible, the director or his/her designee shall consider, among other things, whether the requirement would subject the person or persons to an unreasonable increase in risk or service interruption, or to an unreasonable increase in liability for accidents, or to an unreasonable delay in construction or in availability of its services, or to any other unreasonable technical or economic burden. (o) A person issued a permit pursuant to this chapter shall, at all times, employ the standard of care attendant to the risks involved to prevent actions, failures and accidents which may cause damage, injury or nuisance to persons, the public, the facilities of other persons, or to any city structures or structures owned by other persons located in the public rights-of-way. A person issued a permit pursuant to this chapter shall observe all federal and state statutes and regulations and all applicable city ordinances and safety codes. A person issued a permit pursuant to this chapter shall keep and maintain its facilities in a safe and suitable condition, and in good order and repair.
(Ord. No. 09-062, § 7, 3-17-09; Ord. No. 17-116, § 1(Exh. A), 8-15-17)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.
