For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.03.1224 — Stormwater Pumpage Connection User Charge

Spokane Municipal Code; partial · SMC 13.03.1224 · Effective

Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/c0012e5e-55e3-424f-bc27-02d572d29ac2

Section 13.03.1224 Stormwater Pumpage Connection User Charge

A. Storm/groundwater basement connection for domestic users shall be a fixed rate based upon treatment and collection costs for standard strength wastewater assuming 0.36 M Gal/yr. (25 GPM @ 5 min./hr. x 24 hrs./day for four months) or based on actual sump pump run time and a fixed rate for future stormwater system expansion projects as reviewed and approved by the Wastewater Director. B. Storm/groundwater basement connections for commercial and industrial users shall be a site-specific rate based on treatment and collection costs for standard strength wastewater for the capacity rating of the sump pump and the estimated pumping duration and a fixed rate for future stormwater system expansion projects as reviewed and approved by the Wastewater Director.

Date Passed: Monday, December 8, 2025 Effective Date: Sunday, January 18, 2026 ORD C36776 Section 81

Ask a question about Spokane law

Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.