For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17-233 — Permitted Use; Application and Fees

Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 17-233

Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/c04b7a2c-1b0c-4b56-8f1b-737d2e2237af

Sec. 17-233. Permitted Use; Application and Fees

(A) Permitted Use: Collocation of Network Nodes and the placement of Node Support Poles, meeting the parameters set forth in Section 5 below and in Chapter 284, shall be a permitted use. No zoning or land use review shall apply, subject to the requirements in Section 5. (B) Permit Required. No Person shall place a Network Node, Transport Facility or Node Support Pole in the public right-of-way, without first filing a Permit Application and obtaining a Permit therefore, except as otherwise provided in this Chapter. (C) Permit Application. All Permit Applications filed pursuant to this Chapter shall be on a form, paper or electronic, provided by the City. The Applicant may designate portions of its Application materials that it reasonably believes contain proprietary or confidential information as "proprietary" or "confidential" by clearly marking each page of such materials accordingly, though Applications may be subject to disclosure under the Texas Public Information Act. (D) Application Requirements. The Permit Application shall be made by the Network Provider or its duly authorized representative and shall contain the following: (1) The Applicant's name, address, telephone number, and e-mail address. (2) The names, addresses, telephone numbers, and e-mail addresses of all consultants, if any, acting on behalf of the Applicant with respect to the filing of the Application. (3) Construction and engineering drawings prepared by a professional engineer licensed in the State of Texas, and for wireless facilities proposed to be attached to a Service Pole, a Decorative Pole or other City-owned or -controlled structure, a certification from the engineer that the existing Pole or structure and its foundations have sufficient structural stability to support the proposed Network Node and can bear the wind load without Pole modification, or in the event the installation will require Pole re-enforcement, that such re-enforced Pole will have sufficient structural stability to support the proposed Network Node and can bear the wind load without further Pole modification. Such construction and engineering drawings must also address the design of the connection of any item to the Pole. If Pole re-enforcement is necessary, Provider shall provide construction and engineering drawings for the proposed alteration to the existing Pole. Any re-enforcement or replacement of a Pole shall match the color of the existing Pole. Any Pole re-enforcement or replacement shall be at Provider's sole cost. (4) Detailed 11"x17" drawings to scale, with calculations, showing strict conformity to the size limitations as set forth in City Code in accordance with Chapter 284. (5) Scaled dimensional drawings or pictures of the proposed attachments of the Network Node to the existing Poles or structures as well as any other proposed wireless facility, indicating the spacing from existing curbs, driveways, sidewalks, and other existing Poles. This shall include a before-and-after image of the Pole and all proposed attachments thereto and associated standalone equipment. Any Concealment or Camouflage as required by the City Design Manual or by separate agreement must be detailed and shown. (6) Scaled dimensional construction and engineering drawings indicating the current public right-of-way line and showing any proposed underground conduit and equipment and its spacing from the City's existing utility facilities. Such drawings shall also show a sectional profile of the public right-of-way and identify all existing utilities and existing utility conflicts. (7) An Applicant proposing Collocation on a City-owned service Pole must submit a copy of the signed agreement with the City allowing the Collocation on the City-owned Service Pole located a specific address at the time of filing the Permit Application. (8) A certificate that the Network Node complies with applicable regulations of the Federal Communications Commission. (9) Certification that the proposed Network Node will be placed into active commercial service by or for a Network Provider not later than the 60th day after the date the construction and final testing of the Network Node is completed. (10) Sealed engineering drawings for the electrical service providing power to the proposed Network Node, which must include the conduit size, circuit size, calculations for amp, and distances running. Provider shall use 120 voltage when connecting to any City Service Pole or Decorative Pole and shall provide a key to meter upon inspection. The City is entitled to disconnect power to the Network Node or other wireless facilities in emergency situations. (11) If the location of the proposed wireless facility lies within right-of-way adjacent to a state or federal highway, the Provider must provide evidence of a Permit from the state or federal government (12) Disclosure if the proposed installation is: 1. In an area as described in Section 5 (H). 2. In an underground utility district or other area with undergrounding requirements. (13) If a Network Node is proposed to be installed on a private Utility Pole, the Applicant must submit documentation demonstrating the right to access said Utility Pole. (E) Exemptions. (a) A Network Provider is not required to submit an Application, obtain a Permit, or pay a rate for: (1) routine maintenance that does not require excavation or closing of sidewalks or vehicular lanes in a public right-of-way; (2) replacing or upgrading a Network Node or Pole with a node or Pole that is substantially similar in size or smaller and that does not require excavation or closing of sidewalks or vehicular lanes in a public right-of-way; or (3) the installation, placement, maintenance, operation, or replacement of micro Network Nodes that are strung on cables between existing Poles or Node Support Poles, in compliance with the National Electrical Safety Code. (b) For purposes of Subsection (a)(2): (1) a Network Node or Pole is considered to be "substantially similar" if: (A) the new or upgraded Network Node, including the Antenna or other equipment element, will not be more than 10 percent larger than the existing node, provided that the increase may not result in the node exceeding the size limitations provided by Section 284.003; and (B) the new or upgraded Pole will not be more than 10 percent higher than the existing Pole, provided that the increase may not result in the Pole exceeding the applicable height limitations prescribed by Section 284.103; (2) the replacement or upgrade does not include replacement of an existing Node Support Pole; and (3) the replacement or upgrade does not defeat existing Concealment elements of a Node Support Pole. (c) The determination under Subsection (b)(1) of whether a replacement or upgrade is substantially similar is made by measuring from the dimensions of the Network Node or Node Support Pole as approved by the municipality. (d) Notwithstanding Subsection (a): (1) a Network Provider must provide the City with at least 7 business-days advance written notice of its plan to complete work falling within the description of that subsection; (2) a Network Provider may replace or upgrade a Pole only with the written approval of the Pole's owner; and (3) the size limitations may not in any event exceed the parameters prescribed by Section 284.003 unless the Network Provider obtains prior written approval from the City in accordance with Section 284.109, subject to all applicable zoning or land use regulations and applicable codes. (F) Information Updates. Any amendment to information contained in a Permit Application shall be submitted in writing to the City within 30 days after the change necessitating the amendment. (G) Construction Permit and Right-of-Way Fees. 1. Network Nodes: (a) Construction Permit Fee: The nonrefundable construction Permit fee shall be $500.00 for the first five nodes, $250 for each additions node, not to exceed thirty nodes. (b) Annual Public Right-of-Way Rate Fee: The nonrefundable annual public right-of-way rate shall be $250 per Network Node site installed in the City public rights-of-way. For purposes of calculating the rate, the date of installation shall be six months from the date of Permit approval. (c) Public Right-of-Way Rate Adjustment: , The City may adjust the amount of the annual public right-of-way rate not more than annually by an amount equal to one-half the annual change, if any, in the Consumer Price Index for All Urban Consumers for Texas, as published by the federal Bureau of Labor Statistics (CPI). The City shall provide written notice to each Network Provider of the new rate; and the rate shall apply to the first payment due to the City on or after the 60th day following the written notice. (d) Cease Payment. A Network Provider is authorized to remove its facilities at any time from the public right-of-way and cease paying the City compensation for use of the public right-of-way following removal and written notification to the City of such removal. The Network Provider must leave the public right-of-way in the same or substantially the same condition as it was prior to the installation of its facilities. 2. Node Support Poles: (a) Construction Permit Fee: The nonrefundable construction Permit fee for each Node Support Pole shall be $1,000.00. (b) Annual Public Right-of-Way Rate Fee: The nonrefundable annual public right-of-way rate shall be $250 per Pole installed in the City public rights-of-way. For purposes of calculating the rate, the date of installation shall be six months from the date of Permit approval. (c) Public Right-of-Way Rate Fee. This amount will be adjusted by an amount equal to one-half the annual change, if any, in the Consumer Price Index for All Urban Consumers for Texas, as published by the federal Bureau of Labor Statistics. The City shall provide written notice to each Network Provider of the new rate; and the rate shall apply to the first payment due to the city on or after the 60th day following the written notice. (d) Cease Payment. A Network Provider is authorized to remove its facilities at any time from the public right-of-way and cease paying the City compensation for use of the public right-of-way following removal and written notification to the City of such removal. 3. Transport Facilities: (a) Construction Permit Fee: The nonrefundable construction Permit fee for Transport Facilities shall be $500 for the first five nodes and $250 for each additional node. (b) Public Right-of-Way Rate Fee: The nonrefundable public right-of-way rate fee shall be $28 per month per node located in the public right-of-way for which the installed transport facilities provide backhaul unless or until the time the Network Provider's payment of municipal fees to the municipality exceeds its monthly aggregate per-node compensation to the municipality. (c) Public Right-of-Way Fee This amount will be adjusted by an amount equal to one-half the annual change, if any, in the Consumer Price Index for All Urban Consumers for Texas, as published by the federal Bureau of Labor Statistics. The City shall provide written notice to each Network Provider of the new rate; and the rate shall apply to the first payment due to the city on or after the 60th day following the written notice i. However, no rate is required if the Network Provider is already paying the City an amount equal to or greater than the amount of other City right-of-way fees for access lines under Chapter 283 of the Local Government Code or cable franchise fees under Chapter 66 of the Texas Utility Code. (d) Cease Payment. A Network Provider is authorized to remove its facilities at any time from the public right-of-way and cease paying the City compensation for use of the public right-of-way following removal and written notification to the City of such removal. 4. Micro Network Nodes: (a) No Application fee is required for a Micro Network Node if the installation is attached on lines between Poles or Node Support Poles. 5. Collocation of Network Nodes on City Service Poles (a) Subject to the City's Pole Service Agreement, the Collocation of Network Nodes on City Service Poles shall be at a rate of $20.00 per year per Service Pole. 6. City-Owned Municipal Utility Poles: (a) A Network Provider shall pay an annual Pole attachment rate for the Collocation of a Network Node supported by or installed on a City-owned Utility Pole based upon the Pole attachment rate consistent with Section 54.024 of the Texas Utilities Code, applied on a per-foot basis. 7. The City shall not seek or accept in-kind services in lieu of or as additional payment or consideration from any user of the public rights-of-way for use of the public rights-of-way.

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.