May I use my existing prequalification procedures with design-build contracts?
23 C.F.R. § 636.208
in effectEffective Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-23.xmlFetched: 7/26/2026
