Sec. 40-92. - Specifications for cement work.
The city hereby adopts and approves as standard specifications for cement sidewalks, driveways, curbs and gutters the following:
(1) Materials. Cement or concrete sidewalks, driveways, curbs and gutters shall be built of Portland cement, fine aggregate and coarse aggregate.
(2) Fine aggregate. Fine aggregate shall consist of washed sand having clean, hard, durable, uncoated grains, free from soft or flaky particles or other injurious matter, shall be well graded from coarse to fine and, when tested by standard laboratory methods, shall meet the following requirements:
Percent
Retained on by weight
⅜″ screen .....0%
¼″ screen .....0—5%
50 mesh sieve .....70—95%
100 mesh sieve .....95—100%
Weight removed by elutriation test not more than 2%.
When subjected to the color test for organic impurities, fine aggregate shall not show a color darker than the standard color.
Aggregates from different material sources, or aggregates from the same source having different grading or other physical characteristics, shall be stock piled separately and batched independently. Aggregates shipped in dirty cars or containers, or that which becomes mixed with weeds, dirt or other foreign material, or that which is not uniform or the component parts of which have become segregated will be rejected.
(3) Coarse aggregate. Coarse aggregate shall consist of crushed stone, gravel or oyster shell, having hard, clean, strong, durable pieces free from excessive adherent coatings, free from salt and alkali, and, when tested by standard laboratory methods, shall conform to the following requirements:
The maximum percentage of deleterious substances shall not exceed the following values by weight:
Removed by decantation .....4%
Shale .....0.25%
Clay lumps .....0.25%
Soft fragments .....3%
Other local deleterious substances, such as friable pieces .....3%
The sum of the percentages of all above constituents shall not exceed .....5%
The wear for crushed stone or gravel shall not exceed the following percentages:
Crushed stone .....7%
Gravel .....17%
Coarse aggregate shall conform to the grading requirements given below when tested on standard round-opening screens, and shall be well graded within the limits specified. Aggregates of different classes shall not be mixed except on the written permission of the engineer. Changes in the classes of aggregate being used while the work is in progress will be permitted upon due notice by the contractor to the engineer of his intentions and the fulfillment of the necessary requirements to comply with these specifications. Aggregates in which different size particles have become segregated due to improper stock-piling, improper handling, or for other reasons, shall before being used, be mixed to conform to the grading requirements hereinafter specified, and shall be uniform.
Coarse aggregate (crushed stone or gravel)
Percent
Retained on by weight
3″ screen
2½″ screen .....0—5
1½″ screen .....5—40
¼″ screen—Not less than .....90
No. 8 sieve—Not less than .....95
Coarse aggregate (oyster shell)
Percent
Retained on by weight
2½″ screen
1½″ screen .....5—20
¾″ screen .....20—50
¼″ screen .....65—90
No. 8 sieve .....88—100
Aggregates from different material sources, or having different characteristics, shall not be mixed either in piling or batching, except by special permission from the engineer. Aggregate shipped in dirty cars or containers, or that becomes mixed with weeds, dirt or foreign material, or that is not uniform, or the component parts of which have become segregated will be rejected.
(4) Concrete body. The concrete shall be composed of standard Portland cement or an approved high early strength cement, fine aggregate, coarse aggregate and water, mixed and proportioned according to the workability factor method of design, and in accordance to definite specification requirements herein outlined.
The concrete shall contain not less than four sacks of cement per cubic yard and not more than eight gallons of water net per sack of cement when gravel coarse aggregate is used.
The concrete shall contain not less than five sacks of cement per cubic yard and not more than eight and one-half gallons of water net, per sack of cement when oyster shell coarse aggregate is used.
The concrete shall be uniform and workable. The amount of coarse aggregate (dry loose volume) shall not be more than 0.85 cubic feet per cubic foot of concrete.
The net amount of water will be the amount of water added at the mixer plus the free water in the aggregates, plus or minus the absorption of the aggregates, based on a 30 minute absorption period. No water allowance will be made for evaporation after batching.
(5) Foundation. The foundation shall consist of firm, hard soil from which all vegetable matter and other loose material have been removed. In the event it is necessary to build up the foundation, the same shall be done with selected earth or other material satisfactory to the city engineer and shall be built up and well tamped in six-inch layers and such filling shall extend at least one foot on each side of the walk.
(6) Location and grade. All sidewalks, driveways, curbs and gutters shall be built as located by the city engineer, and on the grade established by him. At street intersections and at other places, the curb and gutter may be built on a radius, as the city engineer may direct, and the contractor in charge of the work shall receive no extra compensation on account of such work being on a curved alignment. Where driveways occur into private property across the parkway between the curb line and the sidewalk, such driveways shall be built with a return curb, having a vertical face and joining the main curb of the street with a two-foot radius.
(7) Combined curb and gutter.
a. Thickness. The standard combined curb and gutter shall consist of a curb six inches in thickness and 15¾ inches in height combined with a gutter eight inches in thickness and 18 inches in width, all built as a monolithic structure. The outer corner of the curb shall be rounded to a three-inch radius.
b. Templates. The curb and gutter shall be constructed with a one-eighth-inch metal template placed at six foot intervals. These shall be removed before placing the topping.
c. Mortar topping. The mortar topping shall be a mortar composed of one part of Portland cement and 1½ parts of fine aggregate thoroughly mixed dry before the addition of water.
The face board and templates shall be removed as soon as the concrete has set sufficiently to stand up and the mortar topping shall then be immediately applied. The topping shall be ¾-inch thick on the top of the curb and the top of the gutter and shall be ½-inch thick on the face of the curb.
d. Finishing. The mortar topping shall be given a smooth trowel finish and shall have a ¼-inch "finish joint" at the exact location of each template joint.
The back edge of the curb and the front edge of the gutter shall be rounded with a one-half-inch edging tool.
The back of the gutter at the face of the curb shall be finished with a one-inch radius.
The curb and gutter surface shall be lightly brushed to remove all trowel marks.
e. Expansion joints. An approved type of commercial pre-molded expansion joint one-inch thick shall be placed at the end of all radius returns at street intersections and where meeting existing inlets.
The joint materials shall be cut from one piece of material to conform to the shape of the curb and gutter.
(8) Sidewalks.
a. Thickness. Standard sidewalks shall be composed of not less than 4¼ inches of concrete and ¼ inch of mortar topping, making a total of 4½ inches. The maker's name shall be stamped on each sidewalk built by him in letters not less than 1¼ inches high and ¼-inch deep.
b. Expansion joints. An approved type of commercial pre-molded expansion joint ½-inch thick shall be placed where two lines of sidewalks intersect, where meeting existing walk at intervals of not more than 36 feet throughout the entire length of the sidewalk. At all places where sidewalks meet curbs, a one-inch approved type of commercial pre-molded expansion joint shall be provided. An expansion joint material shall extend entirely through the sidewalk, and shall extend the entire width of the sidewalk.
c. Mortar topping. The mortar topping shall be a mortar composed of one part Portland cement and 1½ parts of fine aggregate thoroughly mixed dry and may be applied wet or dry.
All topping must be applied before the concrete has been in place not more than ten minutes.
In the use of dry or monolithic topping, the topping must be applied while excess water is on the concrete and must be worked to a plastic mixture by the use of wood floats or darbies. The addition of water to the dry mortar topping will not be allowed unless there is insufficient excess water in the concrete to thoroughly wet the dry mortar.
The mortar topping shall be smoothly struck off by use of a wood strike board riding on top of the forms. The surface shall then be smoothly finished with a wood hand float working in a circular or rotary motion.
The edges of the walk shall be rounded off with a one-half-inch radius edging tool.
The walk shall be marked off one-eighth-inch deep at a spacing equal to the width of the walk with a joint tool equal in width to the width of the edging tool.
(9) Driveways.
a. Thickness. Standard concrete driveways shall be composed of not less than five and three-quarter inches of concrete and one-quarter-inch of mortar topping, making a total of six inches.
On streets having curb and gutter, the driveway shall have a monolithic curb on each side, six inches in width and a varying height, meeting the height of the curb at the street and meeting the sidewalk elevation. This curb shall have at least a two-foot radius joining with the street curb and shall have a wet mortar topping one-half-inch thick.
b. Expansion joints. An approved type of commercial premolded expansion joint material one inch thick and extending entirely through the driveway for its full width and depth shall be placed at the sidewalk intersection.
c. Mortar topping. The mortar topping shall be a mortar composed of one part Portland cement and one and one-half parts of fine aggregate thoroughly mixed dry and may be applied wet or dry.
All topping must be applied before the concrete has been in place not more than ten minutes.
In the use of dry monolithic topping, the topping must be applied while excess water is on the concrete and must be worked to a plastic mixture by the use of wood floats or darbies. The addition of water to the dry mortar topping will not be allowed unless there is insufficient water in the concrete to thoroughly wet the dry mortar.
d. Finishing surface. The mortar topping shall be struck off with a wood strike board to a smooth finish. The surface shall then be smoothly finished with a wood darby and a hand float working in a circular or rotary motion.
(10) Protecting new work. After sidewalks, driveways, curbs and gutters have been completed they must be protected from injury by keeping traffic off for at least five days, and from the sun by a covering of sand, boards, building paper or canvas, and must be sprinkled daily for at least two days after completion.
(11) Miscellaneous. In general, all forms shall be smooth and the work shall be done in a workmanlike manner giving straight lines where required, true planes and a smooth finish properly brushed to remove marks and shall be in every way satisfactory to the city engineer. When the work is completed, all curbs shall have earth thoroughly filled in and tamped against the back; all rubbish, surplus excavated material, forms and other materials shall be removed and the work left in a neat and orderly manner.
(Code 1968, § 41-92; Ord. No. 90-635, §§ 110, 112, 5-23-90)