15.44.090 - Permit procedures.

The following procedures and criteria shall be used in processing an application for the permit required by Section 15.44.003 or Section 15.44.020: A. Plans, specifications and methods of construction required by the authorizing official shall be submitted in quadruplicate. B. Shoring plans submitted shall be designed by and bear the seal of a professional engineer licensed in the state. C. All shoring systems, including the members, their connections, and support, shall be designed to carry the loads imposed on them and details shall be shown on the plans. D. Allowable stresses, including allowances for short term loading, for timber, steel, or concrete shall be based on the Seattle Building and Construction Code (Title 22). E. Soil investigations and reports may be required for all excavations described in Section 15.44.020 so that appropriate pressures may be established. The authorizing official may require investigations at any depth whenever specific conditions existing at the site of such excavation reveal an unstable soil structure, circumstances indicate that the excavation may impair the lateral support of any public place or any adjacent City property, or that such further investigation will supply information necessary to properly evaluate the application for the permit or shoring plans submitted. When highway traffic can come within a horizontal distance from the top of the shoring equal to one-half of its height, the pressure shall have added to it a live load surcharge pressure equal to not less than 2 feet of earth. F. Soldier piles, tie-back rods, anchors, and other shoring materials that are intended to remain in a public place after completion of the construction on adjoining property shall be shown on the plans submitted and so identified. If approved, the authorizing official may require that the plans filed be supplemented upon completion of construction, with a set of plans or other documents showing such residuals in public places, as constructed. G. When the plans presented show an encroachment upon the property interest of an abutting owner or of a franchise holder in a public place, the authorizing official may require that the consent of the person so affected be obtained as a condition of the issuance of the permit provided for in Section 15.44.020. H. If in the opinion of the Director of Transportation or Director of the Seattle Department of Construction and Inspections the design of any excavation or fill, whether shored or not, does not adequately protect the public place, the authorizing official may require a third party review of the design. Third party review requires the applicant's geotechnical and/or additional technical studies to be reviewed by an independent third party, paid for by the applicant but hired by the authorizing official. Third party review shall be conducted by a qualified engineering consultant. I. Backfilling and restoring of excavations or cave-ins in public places is regulated by Chapter 15.26.

(Ord. 124919, § 56, 2015; Ord. 118409 § 92, 1996; Ord. 117569, § 108, 1995; Ord. 109507 § 1(part), 1980; Ord. 106078 § 1(part), 1976; Ord. 103060 § 1(part), 1974; Ord. 98197, § 1, 1969; Ord. 94436, § 1, 1965; Ord. 90047, § 41(i), 1961.)

Ask a question about Seattle law

Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.