For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16-512 — ISSUANCE OF PERMIT

Fort Worth City Code (2026 S-20: local legislation current through Ordinance 28600-06-2026, effective June 9, 2026) · Fort Worth City Code § 16-512

Corpus is an independent public-information project, not the official City of Fort Worth website. Stable reference: corpuslaw.us/code/c0f3cc4d-de7c-440f-ae30-f78cba22912f

§ 16-512 ISSUANCE OF PERMIT.

(a) The director may issue an initial public interactive water feature permit only if all of the following conditions are met: (1) A completed application has been filed; (2) All required fees have been paid in full; (3) Detailed plans and specifications demonstrating compliance with all requirements of this article have been submitted and reviewed by the director or detailed plans and specifications demonstrating compliance with some requirements of this article have been submitted and reviewed by the director and the director has granted a written variance or waiver from compliance with any remaining requirements of this article; (4) A licensed professional engineer has examined the plans and specifications and certified by original signature and engineer's seal that the plans and specifications comply with all requirements of this article; (5) A pre-operation inspection by the director has been completed and the PIWF is found to be in compliance with all requirements of this article; and (6) A licensed professional engineer has inspected the PIWF and certified by original signature and engineer's seal that the PIWF is installed and constructed in accordance with all requirements of this article. (b) A permit is valid only for the PIWF for which it is issued. A separate permit shall be required for each PIWF located on the same premises. Multiple PIWFs sharing a common circulation and filtration system must have separate health permits. A permit is not transferable to other persons or PIWFs. (c) A permit is valid for one year from the date of its issuance unless: (1) It is suspended or revoked by the director; (2) The PIWF changes ownership; or (3) The PIWF is remodeled extensively. (Ord. 27903-08-2025, § 1, passed 8-26-2025)

Ask a question about Fort Worth law

Corpus searches the Fort Worth sections it holds and shows the ones that match, with their citations. Free, no sign-in.