ELT test procedures.
47 C.F.R. § 87.197
in effectEffective ELT testing must avoid outside radiation. Bench and ground tests conducted outside of an RF-shielded enclosure must be conducted with the ELT terminated into a dummy load.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-47.xmlFetched: 7/26/2026
