Sec. 29-103. - Alternatives to on-site detention.
Alternatives to on-site detention are as follows: (1) Generally. Where on-site detention is deemed inappropriate due to local topographical or other physical conditions, alternate methods for accommodating increases in stormwater runoff shall be permitted. The methods may include: a. Off-site detention or comparable improvements. b. In-lieu monetary contributions for channel improvements or off-site detention improvements by the city within the same watershed. Channel improvements shall only be used if they are an integral part of a detailed watershed study. (2) In-lieu contributions to regional or subregional detention. An owner may contribute to the construction of a regional or subregional detention site constructed or to be constructed in lieu of constructing on-site detention. However, no in-lieu contributions are allowed when existing flooding occurs downstream from the development, or if the development will cause downstream flooding. (3) In-lieu fees. The in-lieu fee contribution shall be based upon an amount of ten thousand dollars ($10,000.00) per acre-foot of stormwater storage. (4) Excess stormwater storage credit. An owner may receive credit for excess stormwater storage (in acre-feet) created on one (1) site that may be applied to another site within the same watershed. The transfer of storage volume credit (in acre-feet) shall not be allowed if the site where credited storage is proposed to be transferred has an existing flooding condition downstream or the proposed development will produce downstream flooding. (5) Regional or subregional detention sites. The acquisition of regional or subregional detention sites and construction of facilities thereon will be financed by the city. Monies contributed by the owners as above provided shall be used for regional and subregional detention site studies, land acquisition and facility construction thereof in the watershed in which the development is located. (6) Watershed boundaries. The boundaries of watersheds and priority of acquisition of regional and sub-regional detention sites in construction of detention facilities and location thereof shall be established by the department of planning and development and approved by the planning commission.
(Code 1961, § 35A-70(g); Ord. No. 17,697, § 1a, 3-17-98; Ord. No. 21,867, § 1, 5-19-20)
Ask a question about Little Rock law
Corpus searches the Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.