Sec. 25-86. Wastewater; Sewer main extension requirements.
If the City determines that the extension of sewer mains to undeveloped areas is in the public interest, then all such extensions shall comply with the provisions of this Chapter and Chapter 23 of the City Code. (a) The property owner must pay all costs for constructing sewer lines of such sizes as to afford adequate service during peak flows for the entire area to be served by the extension main. (b) The Water Services Director shall establish the area that the sewer main shall service, which may extend beyond the limits of the property being developed. (c) The property owner's engineer shall submit for the Water Services Director's approval the required size and layout of public sewer mains that will meet sewer flow requirements as required by this Code. The final decision on size and layout of public sewer mains shall be made by the Water Services Director. (d) The field engineering, plans, and specifications required for sewer main extensions shall be prepared by the developer and approved by the City Engineer prior to construction. The engineering costs for preparation of plans and staking of the water main extensions on the property which are incurred by the property owner may be included in the agreed construction costs as determined by the City Engineer and as provided in this Section. The City shall perform the inspections during construction. (e) Where lift stations are necessary to transport sewage due to ground elevation issues within the City service area, the property owner shall construct at the owner's expense the necessary lift station to City specifications. If the lift station facility provides service for more than a single residential lot, the City may assume ownership and operation of such installation upon its completion and acceptance by the City. If a booster pump facility provides pressure for a single residential lot, the property owner shall be solely responsible to operate and maintain the facility after it is approved by the City for operation. (f) The City may require the construction of the sewer main extension to meet additional specifications and requirements if such is determined to be in the best interest of the City and necessary to protect the public health, safety, and welfare. (Code 1977, §§ 12-9-1 through 12-9-6; Ord. No. 92-03, 2/11/92, Amended; Ord. No. 02-41, 6/7/02, Amended (SUPP 2002-2); Ord. No. 08-35, 12/02/08, Repealed Sec. 25-86. Extension mains, definitions., Enacted Sec. 25-86. Wastewater; sewer main extension requirements. (SUPP 2008-4); Ord. No. 2017-36, § 35, 6-13-17; Ord. No. 2026-01, § 31, 1-13-26)
Ask a question about Peoria law
Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.