§ 31-402.5 — Other required submittals
Salinas Municipal Code (Supp. No. 110, 9-26: codified through Ordinance No. 2696(NCS), passed June 16, 2026) · Salinas City Code § 31-402.5
Corpus is an independent public-information project, not the official City of Salinas website. Stable reference: corpuslaw.us/code/c394419c-e265-4567-8d74-a4beea3e9cac
Sec. 31-402.5. - Other required submittals.
The final map shall be accompanied by the following data, plans, reports, and documents in a form as approved by the city engineer. The city engineer may waive requirements for the final map if the location of the property and the nature of the proposed subdivision or other documentation demonstrate that compliance with the requirements is not necessary. (a) Improvement plans. Improvement plans as required by Article 10 of this chapter. (b) Soils report. (1) Soil investigation. If the preliminary soil report prepared for the tentative map indicated the presence of critically expansive soils or other soil problems, rocks, or liquids containing deleterious chemicals, as described in Subsection 31-401.4(b), soils report, the soil investigation shall recommend corrective action which is likely to prevent structural damage to dwellings proposed to be constructed on the expansive soil. Two copies of the report shall be filed with the city engineer. Additionally, any other soils report required by the conditions of tentative map approval shall be provided. (2) Approval of soil investigation. The city engineer, upon the concurrence of the building official, shall approve the soil investigation if it determines that the recommended corrective action is likely to prevent structural damage to each dwelling to be constructed on each lot in the subdivision and requires that the corrective actions be incorporated into the construction of each structure. The city engineer and/or building official may require additional corrective action if required to prevent damage to structures. (c) Improvement agreement. Proposed improvement agreement in conformance with the requirements of Article 10 of this chapter for any subdivision improvements or improvements required by other conditions of approval that will not be completed prior to recordation of the final map or parcel map. (d) Title report. A preliminary title report in the name of the owner of record showing all parties with a legal or equitable interest and all easements, covenants, and other encumbrances and interests in the property at the time of filing the final map. (e) Improvement bond estimate. The improvement bond estimate shall include all improvements within public rights-of-way, easements, or private common areas, and utility trench backfill as provided by the developer, except for those utility facilities installed by a utility company under the jurisdiction of the California Public Utilities Commission. Letters from utility companies stating that all costs for facility installations have been paid shall be submitted to the city for their records. (f) Deeds for easements or rights-of-way. Deeds for off-site easements or rights-of-way required for road, drainage, SWDS/NPDES features, or other purposes which have not been dedicated on the final map; and written evidence acceptable to the city in the form of rights-of-entry or permanent easements across private property outside of the subdivision permitting or granting access to perform necessary construction work and permitting the maintenance of the improvements. (g) Traverse closures. Traverse closures for the boundary, blocks, lots, easements, street centerlines and monument lines. (h) Hydrology and hydraulic calculations. Complete hydrology and hydraulic calculations of all storm drains, including those related to Low Impact Development requirements under the city's NPDES permit. (i) Organizational documents. Any proposed declaration of covenants, conditions, and restrictions, and all other organizational documents for the subdivision in a form as prescribed by Section 4200 et seq. of the Civil Code. All documents shall be subject to review by the city engineer, city planner, and city attorney. (j) Additional information. Any additional data, reports, or information as required by the city engineer or city planner to ensure compliance with conditions of tentative map approval, this chapter, or the Subdivision Map Act. (k) Filing fee. Payment of all fees as required by the city for the processing and plan check/map check costs necessary to complete and record the final map.
(Ord. No. 2585 (NCS), § 1, 12-13-2016)
Ask a question about Salinas law
Corpus searches the Salinas sections it holds and shows the ones that match, with their citations. Free, no sign-in.
