For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Roof Support

30 C.F.R. Part 75, Subpart C
in effect

30 C.F.R. § 75.200 Scope.

30 C.F.R. § 75.201 Definitions.

30 C.F.R. § 75.202 Protection from falls of roof, face and ribs.

30 C.F.R. § 75.203 Mining methods.

30 C.F.R. § 75.204 Roof bolting.

30 C.F.R. § 75.205 Installation of roof support using mining machines with integral roof bolters.

30 C.F.R. § 75.206 Conventional roof support.

30 C.F.R. § 75.207 Pillar recovery.

30 C.F.R. § 75.208 Warning devices.

30 C.F.R. § 75.209 Automated Temporary Roof Support (ATRS) systems.

30 C.F.R. § 75.210 Manual installation of temporary support.

30 C.F.R. § 75.211 Roof testing and scaling.

30 C.F.R. § 75.212 Rehabilitation of areas with unsupported roof.

30 C.F.R. § 75.213 Roof support removal.

30 C.F.R. § 75.214 Supplemental support materials, equipment and tools.

30 C.F.R. § 75.215 Longwall mining systems.

30 C.F.R. § 75.220 Roof control plan.

30 C.F.R. § 75.221 Roof control plan information.

30 C.F.R. § 75.222 Roof control plan-approval criteria.

30 C.F.R. § 75.223 Evaluation and revision of roof control plan.