Limitation.
AS 29.60.440
in effect29.60.440. Limitation.
AS 29.60.400 — 29.60.440 do not require that a recipient of a grant for a feasibility study must proceed with construction of the project, regardless of whether the project is determined to be feasible.
Source: Alaska State Legislature (akleg.gov)URL: https://www.akleg.gov/basis/statutes.asp?media=print&secStart=29.60.440&secEnd=29.60.440#29.60.440Fetched: 10/20/2026
