§ 47-8 — Approval, acceptance, and assurances of construction
Code of the City of Chandler (Supp. No. 80: codified through Ordinance No. 5171, adopted July 13, 2026) · Chandler City Code § 47-8
Corpus is an independent public-information project, not the official City of Chandler website. Stable reference: corpuslaw.us/code/c4fa3ec9-f976-4408-b722-32d9c452bf7c
47-8. - Approval, acceptance, and assurances of construction.
Upon completion of all improvements in accordance with the City standards, the designated City Engineer shall acknowledge in writing acceptance of the off-site improvements. Acceptance shall be conditioned upon a one-year warranty for workmanship, materials and equipment by the developer. After the lapse of the one-year period dated from the letter of acceptance, the improvements shall be considered the maintenance responsibility of the City. If, during the one-year period, the developer is required to replace or repair any improvements, the developer shall secure a new encroachment permit without payment of fee to cover the necessary work. Plans and specifications together with the plan review fee, for such replacement or repair shall be submitted for review and approval unless waived by the designated City Engineer. 47-8.1. Partial acceptance. If at any time during the prosecution of the project the contractor substantially completes a unit or portion of the project, such as a structure, utility service, or a section of the road pavement, the developer may request the designated City Engineer to make final inspection of that work. If the designated City Engineer finds, upon inspection, that the work has been satisfactorily completed in compliance with plans and specifications, s/he may conditionally accept the work as being completed. Acceptance in such cases is conditional on the remaining work being completed without damage and including any final grading adjustments or other minor work. Such partial acceptance shall in no way void or alter any plans and specifications. 47-8.2. Final acceptance. Upon due notice from the contractor of presumptive completion of the entire project, the designated City Engineer will make an inspection. If all construction provided for and contemplated by the plans and specifications is found completed to satisfaction of the designated City Engineer that inspection shall constitute the final inspection and the designated City Engineer will make the final acceptance. The contractor will be notified in writing of this acceptance as of the day of the final inspection. If, however, the inspection disclosed any work, in whole or in part, as being unsatisfactory, the designated City Engineer will give the contractor the necessary instructions for correction of same, and the contractor shall immediately comply with and execute such instructions. Upon correction of the work, another inspection will be made which shall constitute the final inspection provided the work has been satisfactorily completed. In such event, the designated City Engineer will make the final acceptance and notify the contractor in writing of the final acceptance as of the date of the last and final inspection.
(Ord. No. 1270, § 2, 3-8-84; Ord. No. 3061, § 3, 11-18-99; Ord. No. 4802, § 2(Exh., § 16), 4-26-18)
Ask a question about Chandler law
Corpus searches the Chandler sections it holds and shows the ones that match, with their citations. Free, no sign-in.
