22.805.070 - Minimum requirements for on-site stormwater management

A. Applicability. The requirements of this Section 22.805.070 apply as required in Section 22.805.040 to Section 22.805.060. B. Requirements. On-site stormwater management shall be installed to the extent allowed by law and maintained in compliance with the rules promulgated by the Director to receive flows from that portion of the site being developed and shall: 1. Comply with either: a. Subsection 22.805.070.C (On-site performance standard); or b. Subsection 22.805.070.D (On-site lists). C. On-site performance standard: 1. If the existing hard surface coverage is less than 35 percent and the project discharges to a listed creek, or to the drainage basin of such creek: a. The post-development discharge durations shall match the discharge durations of a pre-developed forested condition for the range of pre-developed discharge rates from 8 percent of the 2-year peak flow to 50 percent of the 2-year peak flow. 2. For all other projects: a. The post-development discharge durations shall match the discharge durations of a pre-developed pasture condition for the range of pre-developed discharge rates between the 1 percent and 10 percent exceedance values. D. On-site lists 1. For each project surface, follow the appropriate project table in this subsection 22.805.070.D to evaluate on-site BMPs shown for that type of surface, by category. The project tables apply to roofs and other hard (non-roof) surfaces. All on-site BMPs used must comply with the rules promulgated by the Director. For each surface, consider all the applicable on-site BMPs in the first category. Use any that is considered feasible. If none is feasible for that surface, move on to each successive category and repeat the selection process as necessary. Once one on-site BMP is used for a surface, no other on-site BMP is necessary for that surface. If no BMP in the appropriate categories is feasible, then no further evaluation is required for that surface under this subsection 22.805.070.D.1. Feasibility shall be determined by evaluation against: a. Design criteria, minimum size, limitations, and infeasibility criteria identified for each BMP in this subsection 22.805.070.D and the rules promulgated by the Director; and b. Competing needs. This subsection 22.805.070.D may be superseded or reduced by the Director if the installation of the BMPs is in conflict with: 1) Any of the following federal or state laws, rules, and standards, as may be amended or superseded: historic preservation and archaeology laws identified in subsection 22.805.070.E (Historic preservation and archaeology laws), Federal Superfund or Washington State Model Toxics Control Act, Federal Aviation Administration requirements for airports, the Americans with Disabilities Act, and related rules and standards; or 2) Special zoning district design criteria adopted and being implemented pursuant to a community planning process. Special zoning districts include, for example, historic and preservation districts, pedestrian zone overlays, station area overlays, special review districts, multifamily residential zones, regional centers and urban centers, and master planned communities. Specific criteria in these areas include, but are not limited to, minimum Floor Area Ratio standards; zero lot line development; usable open space requirements; minimum sidewalk width and required bicycle facilities; alley, loading, and access requirements; pitched roof standards; and street-level development standards for modulation and projections; or 3) Public health and safety standards; or 4) Transportation regulations to maintain the option for future expansion or multi-modal use of public rights-of-way; or 5) Chapter 15.43 (Tree and Vegetation Management in Public Places); Chapter 25.09 (Regulations for Environmentally Critical Areas); Chapter 25.11 (Tree Protection); and Chapter 23.60A (Standards for Vegetation in the Shoreline Master Plan). 2. For parcel-based projects, Table A for 22.805.070 applies. Table A for 22.805.070 On-site List for Parcel-based Projects Category | BMPs | Projects Discharging to a Receiving Water Not Designated by Section 22.801.050, Public Combined Sewer, or Capacity-constrained System, or its Basin | Projects Discharging to a Designated Receiving Water or its Basin 1 | Full Dispersion | R, S | R, S 1 | Infiltration Trenches | R, S g | R, S g 1 | Drywells | R, S g | R, S g 1 | Rainwater Harvesting—Category 1 Sizing | X e | X e 2 | Rain Gardens With or Without Tree | R a , S a | R a , S a 2 | Infiltrating Bioretention With or Without Tree | R, S | R, S 2 | Infiltrating Soil Cell Bioretention With Tree | X | X 2 | Permeable Pavement Facilities or approved equivalent | R, S | R, S 2 | Permeable Pavement Surfaces or approved equivalent h | S | S 2 | Sidewalk/Trail Compost-Amended Strip h | S | S 3 | Infiltrating Soil Cell Bioretention Without Tree | X | X 3 | Sheet Flow Dispersion | R, S | R, S 3 | Concentrated Flow Dispersion | S | S 3 | Splashblock Downspout Dispersion | R | R 3 | Trench Downspout Dispersion | R | R 4 | Non-infiltrating Bioretention | R d , S d | R d , S d 4 | Non-Infiltrating Soil Cell Bioretention With Tree | X | X 4 | Rainwater Harvesting—Category 4 Sizing | R b, f | X f 4 | Vegetated Roofs | R c | R c 4 | Residential Cistern | X | X 5 | Perforated Stub-out Connections | R | R 5 | Trees | S | S Note that subsection 22.805.070.D.1 requires consideration of all on-site BMPs in a category for feasibility before moving on to each successive category as necessary. Within a category, BMPs may be considered in any order. Key to Table A for 22.805.070 R = Evaluation is required for all roof runoff from parcel-based projects. S = Evaluation is required for all other hard (non-roof) surfaces of parcel-based projects, unless otherwise noted below. X = Evaluation is not required but is allowed. a Rain gardens cannot be used to meet Section 22.805.080 (Minimum Requirements for Flow Control) or Section 22.805.090 (Minimum Requirements for Treatment) or for projects with areas of 5,000 square feet or more hard surface infiltrating on the project site. b Evaluation is not required for projects with less than 20,000 square feet of new plus replaced rooftop surface. c Evaluation is not required for projects with less than 5,000 square feet of new plus replaced rooftop surface. d Water quality treatment BMPs sized to meet Section 22.805.090 (Minimum Requirements for Treatment) may be installed in lieu of non-infiltrating bioretention unless the project discharges to a public combined sewer basin. e Category 1 rainwater harvesting shall be sized to meet the on-site performance standard, subsection 22.805.070.C. f Category 4 rainwater harvesting shall be sized to reduce the runoff volume by 25 percent or more on an annual average basis. g Evaluation of other hard (non-roof) surfaces is not required but is allowed. h Infiltration testing is not required to use for the on-site list approach; it is only necessary to prove infeasibility. 3. For trail and sidewalk projects, Table B for 22.805.070 applies. Table B for 22.805.070 On-site List for Trail and Sidewalk Projects Category | BMPs | Projects Discharging to a Receiving Water Not Designated by Section 22.801.050, or its Basin | Projects Discharging to a Public Combined Sewer or Capacity-constrained System, c or its Basin | Projects Discharging to a Designated Receiving Water, or its Basin 1 | Full Dispersion | S | S | S 2 | Rain Gardens With or Without Tree | S | S | X 2 | Infiltrating Soil Cell Bioretention With Tree d | X | X | X 2 | Permeable Pavement Facilities | X | X a | X a, b 2 | Permeable Pavement Surfaces e | S | S a | X a, b 2 | Sidewalk/Trail Compost-Amended Strip e | S | S | X 3 | Sheet Flow Dispersion | S | S | S 3 | Concentrated Flow Dispersion | S | S | S 4 | Trees | S | S | S Note that subsection 22.805.070.D.1 requires consideration of all on-site BMPs in a category for feasibility before moving on to each successive category as necessary. Within a category, BMPs may be considered in any order. Key to Table B for 22.805.070 S = Evaluation is required for all surfaces of trail or sidewalk projects. X = Evaluation is not required for trail or sidewalk projects. a Minimum permeable pavement area allowed in right-of-way is 2,000 square feet of pavement within the project site. b Installation is not allowed in the right-of-way if new plus replaced pollution-generating hard surface area is less than 2,000 square feet of pavement within the project site. c Does not include any project discharging to a receiving water not designated by Section 22.801.050, or its basin, even if the project discharges to a capacity-constrained system or its basin. d Tree is required unless considered infeasible per rules promulgated by the Director. e Infiltration testing is not required to use for the on-site list approach, it is only necessary to prove infeasibility. 4. For roadway projects, Table C for 22.805.070 applies. Table C for 22.805.070 On-site List for Roadway Projects Category | BMPs | Projects Discharging to a Receiving Water Not Designated by Section 22.801.050, or its Basin | Projects Discharging to a Public Combined Sewer or Capacity-constrained System, g or its Basin | Projects Discharging to a Designated Receiving Water or its Basin 1 | Full Dispersion | S | S | S 2 | Rain Gardens With Tree h | S a | S a | S a 2 | Infiltrating Bioretention With Tree h | S | S b | S b, c 2 | Infiltrating Soil Cell Bioretention With Tree h | X | X | X 2 | Permeable Pavement Facilities | X d | X e, f | X c, e, f 2 | Permeable Pavement Surfaces i | S d | S e, f | X c, e, f 2 | Sidewalk/Trail Compost-Amended Strip i | S e | S e | S e 3 | Sheet Flow Dispersion | S | S | S 3 | Concentrated Flow Dispersion | S | S | S 4 | Trees | S | S | S 4 | Non-Infiltrating Soil Cell Bioretention With Tree h | X | X | X Note that subsection 22.805.070.D.1 requires consideration of all on-site BMPs in a category for feasibility before moving on to each successive category as necessary. Within a category, BMPs may be considered in any order. Key to Table C for 22.805.070 S = Evaluation is required for all surfaces of Roadway Projects. X = Evaluation is not required for Roadway Projects, but is allowed. a Rain gardens cannot be used to meet Section 22.805.080 (Minimum Requirements for Flow Control) or Section 22.805.090 (Minimum Requirements for Treatment) or for projects with areas of 5,000 square feet or more hard surface infiltrating on the project site. b Minimum bioretention cell size top area in right-of-way is 500 square feet (including pre-settling area). Evaluation is only required and installation only allowed when contributing area is sufficient to warrant minimum bioretention cell size in right-of-way. c Evaluation is not required, and installation is not allowed, if new plus replaced pollution-generating hard surface is less than 2,000 square feet. d Evaluation of roadway surfaces is not required, and installation is not allowed, if roadway is an arterial street/collector. e Evaluation of roadway surfaces, including alleys, is not required and installation is not allowed. f Minimum permeable pavement area allowed in right-of-way is 2,000 square feet of pavement within the project site. g Does not include any project discharging to a receiving water not designated by Section 22.801.050, or its basin, even if the project discharges to a capacity-constrained system or its basin. h Tree is required unless considered infeasible per rules promulgated by the Director. i Infiltration testing is not required to use for the on-site list approach; it is only necessary to prove infeasibility. E. Historic preservation and archaeology laws. For use with subsection 22.805.070.D.1.b.1: 1. Federal laws on historic preservation: a. 16 U.S.C. 470, et seq. (National Historic Preservation Act); b. 36 CFR Part 60 (National Register of Historic Places); c. 36 CFR Part 61 (Procedures for State, Tribal, and Local Government Historic Preservation Programs); d. 36 CFR Part 63 (Determinations of Eligibility for Inclusion in the National Register of Historic Places); e. 36 CFR Part 65 (National Historic Landmarks Program); f. 36 CFR Part 68 (The Secretary of the Interior's Standards for the Treatment of Historic Properties); g. Section 106 of National Historic Preservation Act; h. Secretary of the Interior's Standards and Guidelines for Professional Qualifications Standards; i. Executive Order 11593 (Protection and Enhancement of the Cultural Environment); and j. Executive Order 13006 (Locating Federal Facilities in Historic Properties). 2. Washington State laws on historic preservation: a. Archaeological and Cultural Resources (Executive Order 05-05); b. Advisory Council on Historic Preservation (chapter 25-12 WAC); c. Washington State Historic Building Code (RCW 19.27.120); d. Heritage Barn Program (RCW 27.34.400); e. State Historical Societies—Historic Preservation (chapter 27.34 RCW); and f. Abandoned and Historic Cemeteries and Historic Graves (chapter 68.60 RCW). 3. Federal laws on archaeology: a. 16 U.S.C. 470aa, et seq. (Archaeological Resources Protection Act of 1979); b. 16 U.S.C. 469 (Archaeological and Historic Preservation Act of 1974); c. 25 U.S.C. 3001, et seq. (Native American Graves Protection and Repatriation Act); and d. 16 U.S.C. 470, et seq. (National Historic Preservation Act). 4. Washington State laws on archaeology: a. Archaeological and Cultural Resources (Executive Order 05-05); b. Registration of Historic Archaeological Resources on State-Owned Aquatic Lands (chapter 25-46 WAC); c. Archaeological Excavation and Removal Permit (chapter 25-48 WAC); d. Indian Graves and Records (chapter 27.44 RCW); e. Archaeological Sites and Resources (chapter 27.53 RCW); f. Archaeological Site Public Disclosure Exemption (RCW 42.56.300); g. Abandoned and Historic Cemeteries and Historic Graves (chapter 68.60 RCW); and h. Archaeological Activities on State-owned Aquatic Lands—Agreements, Leases, or Other Conveyances (RCW 79.105.600). 5. City of Seattle Laws on Historic Preservation as listed below and historic districts that have been or may be designated by ordinance: a. Chapter 23.66 (Pioneer Square and International Special Review Districts); b. Chapter 25.12 (Landmarks Preservation); c. Chapter 25.16 (Ballard Avenue Landmark District); d. Chapter 25.20 (Columbia City Landmark District); e. Chapter 25.21 (Fort Lawton Landmark District); f. Chapter 25.22 (Harvard-Belmont Landmark District); g. Chapter 25.24 (Pike Place Market Historical District); and h. Chapter 25.32 (Table of Historical Landmarks).

(Ord. 127444, § 5, 2026; Ord. 127375, § 5, 2025; Ord. 126336, § 4, 2021; Ord. 124872, § 40, 2015; Ord. 123105, § 3, 2009.)