§ 74-524 — Alternative compliance process
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 74-524
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/c5a3a505-44f2-4431-8360-cc01a0c4d780
Sec. 74-524. - Alternative compliance process.
(a) The alternative compliance process described in the following subsections shall only be used for development, other than linear transportation projects, that has received a determination of infeasibility. (b) The applicant, when considering alternatives under this process, shall examine the merits of relocating elements of the development to avoid conditions and constraints on the site that prevent runoff reduction. Volume reduction techniques considered shall include vegetated green infrastructure, infiltration, rainwater harvesting and reuse, canopy interception and evapotranspiration, impervious surface removal and disconnection, green roofs, and stormwater better site design. (c) An applicant shall consider and document each alternative that is set out below starting with Alternative #1 and only moving to the next alternative where the previous alternative cannot be met. applicants shall document the specific reasons why each alternative cannot be met. (d) Alternative #1. The applicant shall comply with the following conditions: (1) Manage on-site at least 75 percent of the applicable stormwater management standard in section 74-513(a); and (2) Development shall use a stormwater management system designed to remove at least 80 percent of the calculated average annual post-development total suspended solids (TSS) load as defined in the Georgia Stormwater Management Manual for Runoff from a 1.2 inch rainfall event minus the volume treated using runoff reduction. (e) Alternative #2. The applicant shall comply with the following conditions: (1) Manage on-site at least 50 percent of the applicable stormwater management standard in section 74-513(a); and (2) Development shall use a stormwater management system designed to remove at least 80 percent of the calculated average annual post-Development total suspended solids (TSS) load as defined in the Georgia Stormwater Management Manual for Runoff from a 1.2 inch rainfall event minus the volume treated using runoff reduction. (f) Alternative #3. The applicant shall comply with the following conditions: (1) Manage on-site at least 25 percent of the applicable stormwater management standard in section 74-513(a); and (2) Development shall use a stormwater management system designed to remove at least 80 percent of the calculated average annual post-development total suspended solids (TSS) load as defined in the Georgia Stormwater Management Manual for Runoff from a 1.2 inch rainfall event minus the volume treated using runoff reduction. (g) Alternative #4. The applicant shall comply with the following conditions: (1) Runoff reduction for the first 1.0" of rainfall at an off-site facility or regional stormwater management facility using the following methods: a. the donation of conservation easements to the city, in a form approved by the city, that protect streams and stream buffers, floodplains, forested areas, or greenspace; b. purchase, reforestation, and dedication to the city, of floodplain properties, especially undevelopable and repetitive loss properties; or c. Vegetated green infrastructure, or rainwater harvesting and reuse installed on public or private property; (2) The location of the off-site facility must be chosen according to the following order of preference: a. Locations that yield benefits to the same receiving water that receives runoff from the original construction activity; b. Locations serviced by the combined sewer system; c. Locations within the same catchment area as the original construction activity; d. Locations within the next adjacent catchment area upstream; e. Locations anywhere within the city's jurisdiction; and (3) Development shall use a stormwater management system designed to remove at least 80 percent of the calculated average annual post-development total suspended solids (TSS) load as defined in the Georgia Stormwater Management Manual for Runoff from a 1.2 inch rainfall event minus the volume treated using runoff reduction. (h) When all conditions are fulfilled within a particular alternative, the process is complete, and that alternative becomes the stormwater management standard from section 74-513(a) for the development.
(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20)
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.