Sec. 66-188. - Permit form and standard conditions.

(a) The permit shall be in a form approved by the director and shall contain the following items and conditions: (1) The permit issuance date, expiration date, and effective date. (2) A statement that the permit is nontransferable, unless the conditions of section 66-192 are met. (3) All applicable discharge prohibitions and limitations, including best management practices, based upon applicable pretreatment standards. (4) Self-monitoring, sampling, reporting, notification, and record-keeping requirements shall include an identification of pollutants (or best management practice) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law. (5) Applicable civil and criminal penalties for violation of pretreatment requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. (6) It is unlawful for a permittee to change its industrial process without approval of the director, if such change results in the user exceeding the levels for flow and discharge quality stated in the user's permit. (7) The town, or the town jointly with representatives of the cities of Phoenix or Mesa, may, at any reasonable time, inspect and test any of the wastes being discharged by the company or plant for quality or quantity. A duly authorized town representative may enter the permittee's premises at any reasonable time for the purpose of inspecting plant operations to estimate the quality and quantity of wastes. (8) The permittee will install and maintain flow monitoring and sampling point facilities at the permittee's expense, for the purpose of the town's representative inspecting, observing, and sampling representative flows. (9) Periodic monitoring or other reports set forth in this article, or as required by the director, shall be submitted to the director. (10) The permittee, at least 90 days prior to commencing with any new industrial discharges or any additional industrial discharges which exceed flow levels or quality set forth within the permit, shall apply for a new or amended permit. Any such discharges shall be prohibited until the town grants advance approval of the new or amended permit.

(Ord. No. 2323, § I, 4-7-11)