Final inspection, certification.
Meridian Code of Ordinances § 7-115
in effectSec. 7-115. - Final inspection, certification.
No wiring system shall be energized until after the electrical inspector shall have made the necessary inspections and shall have issued his written certificate of approval. However, if work is done on fixtures or wiring in an existing wiring system at a time when the electrical inspector's office is not open such wiring system may be energized without approval of the electrical inspector upon written certification to the electric utility company by a licensed electrician that the system is ready for electric service, whereupon such licensed electrician shall notify the electrical inspector that the system has been energized and if the city electrical inspector shall thereafter inspect the system and shall disapprove he shall give written notice to the electric utility company to disconnect service.
(Code 1962, § 8-36; Ord. No. 3554, § 1, 4-3-79; Ord. No. 3679, § 1, 1-18-84; Ord. No. 4294, § 1, 10-17-06)
Source: City of Meridian, Mississippi, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/ms/meridian/codes/code_of_ordinances?nodeId=COOR_CH7BUBURE_ARTIVEL_DIV1GE_S7-115FIINCEFetched: 11/1/2026
