§ 6-116 — Permit conditions
Code of Ordinances of the City of Tuscaloosa, Alabama (Codified through Ordinance No. 9809, enacted August 25, 2026 (Supp. No. 103, Update 1)) · Tuscaloosa Code of Ordinances § 6-116
Corpus is an independent public-information project, not the official City of Tuscaloosa website. Stable reference: corpuslaw.us/code/c6f2e5be-bab2-4f38-b832-c5381bdb5e2e
Sec. 6-116. - Permit conditions.
(a) Definition. The word "cost," as used in this section, has reference to and shall mean the total estimated cost of the proposed structure, building alteration, or repair, including all fees paid, or to be paid to architects, surveyors, engineers, contractors, and subcontractors, and others for services rendered or to be rendered in connection with the erection of such building or structure. (b) General provisions. (1) No permit shall be issued until the fees prescribed have been paid; nor shall any amendment to a permit be approved until the additional fee, if any, due to an increase in the estimated cost of the building or structure, shall have been paid. (2) If any person commences any work on a building or structure before obtaining the necessary permit from the city, such person shall be subject to the penalty prescribed herein. (3) Reserved. (4) A building, electrical, plumbing, mechanical, gas and/or temporary power or temporary gas permit shall be required for all federal, state, city and county structures and public boards of education, such permit shall be issued on proper application but without the payment of the applicable permit fee. It is provided, however, that such permit fees will be required for the construction, alteration or repair of any such governmental building or structure if it is not intended or utilized for the actual use and occupancy of the governmental entity. All other permit fees shall be paid at the time that the building permit is issued. (5) When a building permit is issued, the contractor will be furnished with a permit sign showing the permit number. This sign, showing the permit number, will be displayed at the site of the work for which the permit was issued at such point thereon that it is easily visible from the street. (6) Prior to a building permit being issued for an addition to existing permanent structures or new permanent structures (excluding structures such as piers, etc., for which special permits are required) on any property adjacent or adjoining the city's acquisition line on Lake Tuscaloosa, the owner shall submit to the building official a site survey prepared and sealed by a registered professional land surveyor. The required site survey shall indicate the city's acquisition line of Lake Tuscaloosa, the location of all existing and proposed structures (including septic tank(s) and field lines if planned), the location of driveways, the location by property lines and public easements and a statement of the surveyor that the proposed location of the structure does not encroach upon the city's acquisition line. The provisions hereof shall also apply to and a permit shall be required for mobile homes and manufactured homes on any property adjacent or adjoining the city's acquisition line on Lake Tuscaloosa. It shall be unlawful to construct, place or locate any of the foregoing structures on any property adjacent or adjoining the city's acquisition line on Lake Tuscaloosa without complying with the provisions hereof. (7) The building official shall have the authority to waive a general contractor business license when the commercial building valuation of work is under one thousand dollars ($1,000.00) and the property owner(s) is listed as the contractor of record. (8) Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system prior to obtaining the necessary permits and paying the fees as required, shall be subject to a late fee of one hundred (100) per cent of the usual permit fee in addition to the required permit fees. (9) Beginning thirty (30) days prior to the effective date of any withdrawal from the City of Tuscaloosa's police/planning jurisdiction, no permit fee shall be charged for any permit issued for work in the area to be withdrawn. The chief building official of the city shall provide inspection services until the effective date of the withdrawal. (10) No permit shall be issued for a building or structure subject to a violation notice from the city building inspection department declaring the structure a public nuisance in an amount less than that determined by the city's chief building official or his designee to be sufficient to remedy all of the defects noted in the violation notice. (11) No permit shall be issued for a building or structure in an historic district without prior written notification to the city historic preservation commission. (12) Refusal to issue permit. The building official may refuse to issue a building permit to an applicant, where the applicant has incomplete tasks within the permitting process on a separate project or the applicant has incomplete permits on a separate project including but not limited to: incomplete inspections; stop work orders; unattained approvals; or any other non-compliance with applicable code. (c) Accurate records. The building official shall keep a permanent and accurate accounting of all permit fees and other moneys collected, the names of all persons upon whose account the same was paid the date and amount thereof. (d) Notification for inspections. (1) Advance notice of a minimum of one business day (twenty-four (24) hours, Monday through Friday), shall be given to the building official when work is ready for inspection. (2) It shall be the duty of the owner or building contractor to ensure that the work to be inspected is complete and accessible before calling for inspection. (3) Re-inspection fees shall be assessed to valid permits when the inspection has been requested and is not ready for inspection when the inspector arrives for the inspection. In addition a re-inspection fee shall be assessed to valid permits when re-inspections are made and requires another re-inspection to correct a violation addressed in a prior inspection. (4) Anyone aggrieved after receiving notification of a building re-inspection fee, may within ten (10) days of receipt of the notification, file an appeal in writing to the chief building official for review. The chief building official may waive the fee for good cause shown and his decision is final. (5) Anyone aggrieved after receiving notification of a fire re-inspection fee, may within ten (10) days file an appeal in writing to the fire marshal for review. The fire marshal may waive the fee for good cause shown and his decision is final. (6) No certificate of occupancy shall be issued on any valid permit until all fees are paid in full. (7) Specially scheduled building and fire inspections outside of regular working hours shall be requested a minimum of two (2) business days prior to the day of the specially requested inspection. All specially requested building inspections must be approved by the chief building official prior to the inspection. All special requested fire inspections must be approved by the fire marshal prior to the inspection. Special inspection fees shall be accessed to the valid permit(s).
(Ord. No. 6561, 12-18-03; Ord. No. 6775, §§ 2, 3, 6-30-05; Ord. No. 7604, 10-26-10; Ord. No. 8178, § 3, 2-3-15; Ord. No. 8338, §§ 7,8 , 1-19-16; Ord. No. 8820, § 31, 6-4-19)
Ask a question about Tuscaloosa law
Corpus searches the Tuscaloosa sections it holds and shows the ones that match, with their citations. Free, no sign-in.
