For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 60.219 — How to Determine Bufferyard Requirements

Code of the City of Orlando (Supp. No. 93, Update 1: codified through Ordinance No. 2026-10, adopted April 6, 2026) · Orlando City Code § 60.219

Corpus is an independent public-information project, not the official City of Orlando website. Stable reference: corpuslaw.us/code/c8677beb-7fc2-4ef1-b526-b80d6bba1f56

Sec. 60.219. - How to Determine Bufferyard Requirements.

Bufferyards shall be located at the perimeter of the building site for any given use, and shall not be located in any portion of a public right-of-way or any proposed right-of-way established by the Major Thoroughfare Plan, Chapter 61. The following procedure shall be followed to determine the type of bufferyard required: (a) Identify the land use intensity class of the proposed use and all contiguous use(s) by referring to Figure 3, Land Use Intensity Table, in Chapter 58, Part 1. The Zoning Official shall be authorized to determine land use types that do not clearly fall within any of the listed categories. (b) Determine the bufferyard required on each building site boundary (or portion thereof) by referring to Figure 8 of this Part. (c) Select the desired bufferyard option from those enumerated in Figure 9 of this Part. Any of the enumerated options shall satisfy the requirement of buffering between adjacent land uses.

(Ord. No. 2013-74, § 1, 12-9-2013, Doc. #1312091207)

Ask a question about Orlando law

Corpus searches the Orlando sections it holds and shows the ones that match, with their citations. Free, no sign-in.