§ 11-3-17 — Sampling and Analysis
Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 11-3-17
Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/c8b807d9-b6a2-4bd5-9e5d-9a93cd8c109a
11-3-17. - Sampling and Analysis.
(a) No user shall fail to obtain city manager approval for all sampling and measuring equipment prior to its installation or use. All measuring, tests and analyses and all sampling shall be at the expense of the industrial user. Access by the city manager for sampling and analysis is governed by Section 11-3-30, "Inspection," B.R.C. 1981. (b) No user shall fail to conduct all measurements, tests and analyses of the characteristics of water and wastes in accordance with the techniques and procedures prescribed in 40 CFR § 136 or with any other test procedures approved for wastewater by the EPA or the city manager. Samples shall be taken from the utility access point, or other specified location as described in the permit. The city manager may direct a user to save a sample split of any reported sample and to deliver the sample to the water quality laboratory for analytical verification. (c) (1) No user shall fail to monitor at a frequency necessary to assess and assure compliance with applicable pretreatment standards and requirements, and pursuant to all of the requirements set forth below: (A) Grab samples shall be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organic compounds. (B) For all other pollutants, 24-hour composite samples shall be obtained through flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the city manager. The samples may be collected over the course of an operating day if the discharge is not constant for 24-hours. (C) Where time-proportional composite sampling or grab sampling is authorized by the city manager, the samples shall be representative of the discharge and the decision to allow the alternative sampling must be documented in the industrial user file for that facility or facilities. (D) Using protocols including appropriate preservation specified in 40 CFR 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols and sulfides, the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the city manager, as appropriate. (2) For sampling required in support of the baseline monitoring report and ninety-day (90-d) compliance reports, no user shall fail to obtain a minimum of four (4) grab samples for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data does not exist. For facilities for which historical sampling data is available, the city manager may authorize a lower minimum. (d) The frequency of sampling, measuring and analyses will be conditions of the SIUs industrial discharge permit. The city manager may impose mass limitations on significant industrial users that use flow equalization to meet applicable standards or requirements or in other cases where the imposition of mass limitations is appropriate. (e) The city manager has the authority to sample and inspect each SIU at least once a year (1-yr), and more often as necessary, and to inspect any other industrial user as needed to ensure compliance with this chapter. (1) No user shall deny access to the city manager to a user's premises pursuant to Section 11-3-30, "Inspections," B.R.C. 1981, including meters, communications modules and water meter touchpads. (2) The city may randomly sample and analyze the effluent from SIUs and conduct surveillance activities in order to identify, independent of information supplied by SIUs, occasional and continuing noncompliance with pretreatment standards. (f) Whenever sampling and analysis is utilized for determining compliance with this chapter, a violation of any limitation required by this chapter shall occur at discharge monitoring points designated in an industrial discharge permit or at any representative sampling point. Violations at such monitoring points shall constitute violations of the industrial discharge permit and of this chapter. (g) The city manager shall have the authority to require users to conduct groundwater and soil sampling when there is probable cause to believe that any surface or groundwater on or emanating from the property violates any federal, state or local regulations including: (1) Colorado Department of Public Health and Environment, Basic Standards for Surface Water. (2) Colorado Department of Public Health and Environment, Basic Standards for Groundwater. (3) Federal listing of hazardous waste. [11] Ordinance Nos. 5397 (1991); 5677 (1994); 5771 (1995); 7596 (2008); 8565 (2023) Footnotes: --- (11) --- 40 CFR § 261.
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.
