For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 24-141 — Construction and Post-Construction Stormwater Management; Permittee Construction Site Inspections

Peoria, Arizona, City Code (2026 S-10: Local legislation current through Ord. 2026-20, passed 10-6-26) · Peoria, Ariz., City Code § 24-141

Corpus is an independent public-information project, not the official City of Peoria website. Stable reference: corpuslaw.us/code/c91629fe-eae0-41e9-b82c-3b661574af93

Sec. 24-141. Construction and Post-Construction Stormwater Management; Permittee Construction Site Inspections.

(a) The permittee shall make regular inspections of all control measures in accordance with the inspection schedule outlined in the approved SWMP, as required by AZPDES regulations. (1) The purpose of such inspections will be to determine the overall effectiveness of the SWMP and the need for additional control measures. (2) All inspections shall occur at the time interval specified in the SWMP and shall be documented in written form and maintained with the SWMP in chronological order within 24 hours of the inspection. (b) This Section applies to all facilities that have stormwater discharges associated with industrial activity, including construction activity. (Ord. 2010-06, 02/02/2010, Enacted (SUPP 2010-1))

Ask a question about Peoria law

Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.