For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Design of Pipeline Components

49 C.F.R. Part 192, Subpart D
in effect

49 C.F.R. § 192.141 Scope.

49 C.F.R. § 192.143 General requirements.

49 C.F.R. § 192.144 Qualifying metallic components.

49 C.F.R. § 192.145 Valves.

49 C.F.R. § 192.147 Flanges and flange accessories.

49 C.F.R. § 192.149 Standard fittings.

49 C.F.R. § 192.150 Passage of internal inspection devices.

49 C.F.R. § 192.151 Tapping.

49 C.F.R. § 192.153 Components fabricated by welding.

49 C.F.R. § 192.155 Welded branch connections.

49 C.F.R. § 192.157 Extruded outlets.

49 C.F.R. § 192.159 Flexibility.

49 C.F.R. § 192.161 Supports and anchors.

49 C.F.R. § 192.163 Compressor stations: Design and construction.

49 C.F.R. § 192.165 Compressor stations: Liquid removal.

49 C.F.R. § 192.167 Compressor stations: Emergency shutdown.

49 C.F.R. § 192.169 Compressor stations: Pressure limiting devices.

49 C.F.R. § 192.171 Compressor stations: Additional safety equipment.

49 C.F.R. § 192.173 Compressor stations: Ventilation.

49 C.F.R. § 192.175 Pipe-type and bottle-type holders.

49 C.F.R. § 192.177 Additional provisions for bottle-type holders.

49 C.F.R. § 192.179 Transmission line valves.

49 C.F.R. § 192.181 Distribution line valves.

49 C.F.R. § 192.183 Vaults: Structural design requirements.

49 C.F.R. § 192.185 Vaults: Accessibility.

49 C.F.R. § 192.187 Vaults: Sealing, venting, and ventilation.

49 C.F.R. § 192.189 Vaults: Drainage and waterproofing.

49 C.F.R. § 192.193 Valve installation in plastic pipe.

49 C.F.R. § 192.195 Protection against accidental overpressuring.

49 C.F.R. § 192.197 Control of the pressure of gas delivered from high-pressure distribution systems.

49 C.F.R. § 192.199 Requirements for design of pressure relief and limiting devices.

49 C.F.R. § 192.201 Required capacity of pressure relieving and limiting stations.

49 C.F.R. § 192.203 Instrument, control, and sampling pipe and components.

49 C.F.R. § 192.204 Risers installed after January 22, 2019.

49 C.F.R. § 192.205 Records: Pipeline components.