For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-8-12 — MOVED BUILDINGS

City Code of West Jordan, Utah (2026 S-39: code current through Ord. 26-41, passed 7-28-2026) · West Jordan City Code § 13-8-12

Corpus is an independent public-information project, not the official City of West Jordan website. Stable reference: corpuslaw.us/code/c9af9ce6-aaeb-497e-a890-8167f488339b

13-8-12: MOVED BUILDINGS:

A. Purpose: This section is to ensure that relocated buildings will not have an adverse effect on property values and that the buildings will be harmonious and compatible with existing and future anticipated development DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations. "Development" also means the property being developed and/or subdivided, or the act, process or result of developing. in the area. B. Conditional Use Permit CONDITIONAL USE PERMIT: The permission granted by city authorities to use properties under special circumstances and with specific requirements and conditions attached. Required: No persons shall place, move on, or affix to land LAND, REAL ESTATE, REAL PROPERTY: Means and includes land, tenements, hereditaments, water rights, possessory rights and claims. any building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. which was formerly located on another site without first obtaining a conditional use permit. This section shall not regulate an accessory structure ACCESSORY BUILDING OR ACCESSORY STRUCTURE: A building or structure that is subordinate and incidental to the main building on the lot. having a floor area of two hundred (200) square feet or less and a height of twelve feet (12') or less. C. Application Requirements: The following information shall be submitted when an application is made to the planning commission for a conditional use permit CONDITIONAL USE PERMIT: The permission granted by city authorities to use properties under special circumstances and with specific requirements and conditions attached. : 1. Location and address of the old and new sites. 2. Plot plan of the new location, showing adjacent lots on all sides of the property and indicating all structures and improvements on the lot LOT: A parcel of real property shown as a delineated parcel of land with a number and designation on the final plat of a recorded subdivision or a parcel of real property defined by metes and bounds containing not less than the minimum area and width required in the zone in which it is located, together with such yards, open spaces, lot width and area as required by this title. . 3. Plans and specifications for the proposed improvements at the new location, including landscape plans. 4. A filing fee for each building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. to be relocated as established by resolution of the city council CITY COUNCIL: The West Jordan City council. . D. Standards For Relocation: A building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. shall not be relocated unless: 1. The relocated building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. will have no appreciable detrimental effect on the living environment and property values in the area into which it is moved; 2. The relocated building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. is consistent with the architectural style and quality of buildings existing in the area into which the building is proposed to be moved; and 3. The relocated building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. and the lot LOT: A parcel of real property shown as a delineated parcel of land with a number and designation on the final plat of a recorded subdivision or a parcel of real property defined by metes and bounds containing not less than the minimum area and width required in the zone in which it is located, together with such yards, open spaces, lot width and area as required by this title. on which the building will be relocated conforms to the requirements of this title and other applicable codes. E. Cash Bond Required: The owner OWNER: The person or group of person, having record title to a property. or developer DEVELOPER: The person, association or corporation developing or causing to be developed the property subject to the provision of this title. For the purposes of residential construction outside of a recorded subdivision, the applicant for the building permit shall be deemed to be the developer and shall comply with all applicable requirements of this title. shall provide a cash bond or other acceptable financial assurance in a form acceptable to the city CITY: The city of West Jordan, Utah, a municipal corporation. attorney, or lien on the property in sufficient amount to guarantee the obligations imposed by this section for the completion of the remodeling of the relocated building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. per criteria under this section prior to receiving a building permit BUILDING PERMIT: The permit required for new construction and additions pursuant to this title. . F. Construction Time TIME; HOW COMPUTED TIME; HOW COMPUTED: The time in which any act provided by this code is to be done is computed by excluding the first day and including the last, unless the last is a holiday, and then it also is excluded. : The time in which any act provided by this code is to be done is computed by excluding the first day and including the last, unless the last is a holiday, and then it also is excluded. Period: Construction shall be completed within nine (9) months from the date a building permit BUILDING PERMIT: The permit required for new construction and additions pursuant to this title. is issued. The planning commission may grant an extension to this construction period not to exceed three (3) months' time TIME; HOW COMPUTED TIME; HOW COMPUTED: The time in which any act provided by this code is to be done is computed by excluding the first day and including the last, unless the last is a holiday, and then it also is excluded. : The time in which any act provided by this code is to be done is computed by excluding the first day and including the last, unless the last is a holiday, and then it also is excluded. based on reasonable justifications. (2001 Code §89-6-114; amd. 2009 Code)

Ask a question about West Jordan law

Corpus searches the West Jordan sections it holds and shows the ones that match, with their citations. Free, no sign-in.