Sec. 34-43. - Assessments for pavement construction.
(a) Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Assessment factor (AF) means a basement price per front foot of street improvement, hereinafter referred to as AF, which is computed for construction of bituminous pavement, concrete pavement, and bituminous resurfacing as follows:
(1) Bituminous pavement. The AF shall be computed to the next $0.10 by dividing the total cost from the previous year's record of bituminous pavement with a 37-foot width back to back of curb by the total length of the assessable frontage of such pavement and adding any anticipated increase in cost per assessable foot of such pavement.
(2) Concrete pavement. The AF shall be computed to the next $0.10 by dividing the total cost from the previous year's record of concrete pavements with a 45-foot width back to back of curb by the total length of the assessable frontage of such pavement and adding any anticipated increase in cost per assessable foot of such pavement.
(3) Bituminous resurfacing. The AF shall be computed to the next $0.10 by dividing the total cost from the previous year's record of bituminous resurfacing by the total length of the assessable frontage of the resurfaced streets and adding any anticipated increase in cost per assessable foot of bituminous resurfacing.
Bituminous patching means resurfacing of deteriorated areas on streets with approximately a one-inch bituminous mat.
Bituminous pavement means a pavement with a bituminous surface, adequate base, and concrete curb and gutter, generally for streets of residential use, meeting the standards and specifications of the City's Department of Public Works.
Bituminous resurfacing means the resurfacing of a Type "C" street with a 1½-inch to two-inch bituminous overlay from curb to curb.
Collector means a major street assigned the functional classification of collector by either the adopted Green Bay, Wisconsin, Comprehensive Plan or the adopted Brown County Comprehensive Plan.
Concrete pavement means a Portland Cement concrete pavement with integral curb or curb and gutter meeting the standards and specifications of the City's Department of Public Works which shall be used on principal arterials, minor arterials, collectors, and local streets in commercial and industrial areas.
High-type pavement means any pavement structurally equivalent or greater than a six-inch concrete pavement; or a pavement with a minimum 1½-inch bituminous surface on an eight-inch gravel base, six-inch concrete base, or six-inch cement stabilized base.
Local street means a City street which generally serves residential areas or small commercial and industrial areas which is not defined as principal arterial, minor arterial, or collector herein.
Minor arterial means a major street assigned the functional classification of minor arterial by either the adopted Green Bay, Wisconsin, Comprehensive Plan or the adopted Brown County Comprehensive Plan.
Principal arterial means a major street assigned the functional classification of principal arterial by either the adopted Green Bay, Wisconsin, Comprehensive Plan or the adopted Brown County Comprehensive Plan.
Residential zones means properties located within residential districts or mixed-use districts, defined under Articles VI and VII of Chapter 44, for which the primary use of the property is single-family or two-family dwellings.
Type "A" street means a street not previously opened to traffic.
Type "B" street means a street previously opened to traffic but lacking curb and gutter or integral curb.
Type "C" street means a street with a high-type pavement and curb and gutter or integral curb.
(b) AF-computed assessments. Assessments shall be based as follows on an AF computed according to subsection (a) of this section:
Street Construction | Bituminous Pavements | Concrete Pavements
Type "A" street residential zones and institutional zone | 100% AF | Same rate as bituminous pavement
All other zone classifications (single-family and two-family use apply residential zones rate) | 100% AF | 100% AF
Type "B" street residential zones and institutional zone | 60% AF | Same rate as bituminous pavement
All other zone classifications (single-family and two-family use apply residential zones rate) | 90% AF | 90% AF
Type "C" Street
a. Local street residential zones and institutional zone | 30% AF | Same rate as bituminous pavement
All other zone classifications (single-family and two-family use apply residential zones rate) | 65% AF | 65% AF
b. If a street is a bus route and/or heavy traffic route at the time of the special assessment, a 10% reduction in the assessment rate shall be given for residential zones and for single-family and two-family use in all other zone classifications
Bituminous Resurfacing | All Pavement Types
All street types
Residential zones and institutional zone | 60% AF
All other zone classifications (single-family and two-family use apply residential zones rate) | 90% AF
a. If a street is a bus route and/or heavy traffic route at the time of the special assessment, a 10% reduction in the assessment rate shall be given for residential zones and for single-family and two-family use in all other zone classifications
Bituminous Patching | All Pavement Types
All Street Types | 0% AF
(c) Maximum assessments. If the total preliminary assessments for a particular project exceed the City's total cost of the project, the final assessment rate for all parcels in the project will be reduced proportionately. The City's total cost of the project shall include the City's share of the construction cost plus all engineering and administration costs, which shall be equal to 20 percent of the construction costs, in accordance with Wis. Stats. § 66.0703(2).
(d) Assessment protection and credit.
(1) Any current owner who has previously been assessed under this section for pavement construction or reconstruction or for bituminous resurfacing prior to December 7, 1999, shall not again be assessed for the reconstruction or maintenance of such pavement for the following number of years after the Council's acceptance of the street:
a. Bituminous resurfacing: 20 years.
b. Bituminous pavement: 25 years.
c. Concrete pavement: 35 years.
(2) After December 7, 1999, when reconstructing or resurfacing streets, credit will be given to the property owner at the time the street is reconstructed or resurfaced for the remaining useful life of existing pavement calculated on current special assessment rates adopted by the Common Council. The useful life of pavement shall be established as follows:
a. Bituminous resurfacing: 20 years.
b. Bituminous pavement: 25 years.
c. Concrete pavement: 35 years.
(e) Alley assessments. There shall be no special assessments levied against parcels abutting any alley for improvements constructed in the alley unless the only frontage for the parcel is on the alley. If the only frontage for the parcel is on the alley, the special assessments for the improvements constructed in the alley shall be levied as if the alley were a street.
(Code 1984, § 9.43; Ord. No. 14-85; Ord. No. 65-90; Ord. No. 62-92; Ord. No. 31-93; Ord. No. 42-99; Ord. No. 27-20, § 1, 8-18-2020)