For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 49-166 — Wastewater discharge permit conditions

Scottsdale Revised Code (Supp. No. 80: codified through Ordinance No. 4681, adopted July 1, 2025) · Scottsdale Revised Code § 49-166

Corpus is an independent public-information project, not the official City of Scottsdale website. Stable reference: corpuslaw.us/code/ca943a31-6fd1-402d-bbed-3945d0dbabaa

Sec. 49-166. - Wastewater discharge permit conditions.

(a) After evaluating the data furnished by an applicant, the division will determine whether to issue a wastewater discharge permit. (1) A determination as to whether to issue a wastewater discharge permit shall be made within sixty (60) days of the division's receipt of a complete wastewater discharge permit application. (2) Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this article and shall subject the permittee to sanctions as set out in Division 5 of this article. A wastewater discharge permittee shall also comply with all federal and state pretreatment standards or requirements and with any other requirements of federal, state, and local law. (3) The division shall issue a wastewater discharge permit if the division determines that all of the following conditions are met: (i) The applicant has filed a timely and complete permit application and paid all applicable fees; (ii) The applicant's proposed discharge is in compliance with the limitations established in this article; (iii) The applicant's proposed operations and discharges will not interfere with the normal and efficient operation of the POTW, including the collection system; and (iv) The applicant's proposed discharges will not result in a violation of the terms and conditions of any NPDES permit or cause or contribute to pass through or interference. (b) If the division determines that the condition set out in subsection (a)(3)(ii) of this subsection is not met, the division may, in its discretion, issue or amend a wastewater discharge permit provided: (1) the remaining conditions set forth in subsections (a)(3)(i), (a)(3)(iii), and (a)(3)(iv) of this subsection have been met; and (2) the division approves a submitted compliance schedule specifying any additional measures and milestones the applicant must implement to insure compliance with pretreatment standards and requirements. At no time shall the division permit a discharge that may violate any general and specific prohibitions or local limits established in section 49-161 or allow an extension of a final compliance date for a categorical standard. (c) Wastewater Discharge Permit Duration. The division may issue a wastewater discharge permit for any specified period of time, but in no case longer than five (5) years from the effective date of the permit. Each wastewater discharge permit will include a specific expiration date. A permittee shall apply for reissuance of a permit no later than thirty (30) days prior to the expiration date. (d) Wastewater Discharge Permit Contents. (1) A wastewater discharge permit shall include such requirements as the division deems reasonably necessary to prevent pass through or interference, protect the quality of receiving water bodies, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. All wastewater discharge permits shall be expressly subject to all provisions of this article and all other applicable regulations, user charges, and fees established by the City. (2) Wastewater discharge permits shall contain: (i) The permit's issuance date, expiration date and effective date; (ii) A statement that the permit shall not be transferable without prior notification to the City and except in accordance with section 49-166(h); (iii) Effluent limits, including Best Management Practices, based on applicable pretreatment standards; (iv) Self-monitoring, sampling, reporting, notification, and record-keeping requirements including an identification of pollutants (or best management practice) to be monitored, sampling location(s), sampling frequency, and sample type based on federal, state, and local law; (v) Applicable civil and/or criminal penalties for violations of pretreatment standards and requirements, the permit, this article, and any applicable compliance schedule; (vi) Requirements to control slug discharges and to immediately notify the division of any facility changes affecting the potential for a slug or accidental discharge. (3) Wastewater Discharge Permits may contain: (i) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; (ii) Requirements for the installation or construction of pretreatment technology, pollution control, or containment devices designed to reduce, eliminate, or prevent the introduction of pollutants into the POTW; (iii) Accidental spill control plans or other special conditions including management practices necessary to prevent accidental, unanticipated, or non-routine discharges; (iv) Waste minimization plans to reduce the amount of pollutants discharged to the POTW; (v) The unit charge or schedule of user charges and fees for the discharge of wastewater to the POTW; (vi) Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; (vii) A statement that compliance with the permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards and requirements, including those which become effective during the term of the wastewater discharge permit; (viii) Other conditions as the division deems appropriate to ensure compliance with this article, and state and federal laws rules, and regulations; or (ix) Requirements to segregate sewage and industrial wastewater piping, such that the discharge of industrial wastewater flow into the POTW could be halted while still allowing sewage to discharge into the POTW. (e) Applicant's Right to Comment. (1) Upon completion of its evaluation, the division shall develop and provide a draft permit to the applicant. (2) The applicant shall have fourteen (14) days from the date of receipt of the draft permit to file written comments with the division. The division may, but shall not be required to, schedule a meeting with the applicant's authorized representative within fifteen (15) days following receipt of the applicant's comments and attempt to resolve any disputed issues. The applicant is responsible for providing data and other information to support its comments. (3) If the applicant files no comments on the draft permit or if a subsequent agreement is reached concerning the same, the division director shall issue to the applicant a wastewater discharge permit incorporating all such conditions. (f) Wastewater Discharge Permit Appeals. A permittee may petition the division to reconsider a permit denial or the terms of a wastewater discharge permit within fourteen (14) days following a denial or the permit's effective date. (1) Failure to submit a timely petition for reconsideration shall be deemed a waiver of the administrative appeal. (2) In its petition, the permittee must identify the wastewater discharge permit provisions to which it objects, the reason(s) for its objection, and any proposed alternative permit condition(s). If the appeal relates to a permit denial, the applicant must identify all reasons as to why the permit should be issued or a permit renewal should be granted. (3) The provisions and effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. (4) If the division fails to act within thirty (30) days of its receipt of an appeal, the petition for reconsideration shall be deemed denied. Decisions not to reconsider a wastewater discharge permit, not to issue or renew a wastewater discharge permit, or not to modify a wastewater discharge permit shall be considered final administrative actions for purposes of judicial review. (5) Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a timely special action petition with the Maricopa County Superior Court. (g) Permit Modification. The division may modify a wastewater discharge permit for good cause, including, but not limited to, the following reasons: (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the issuance of the wastewater discharge permit; (3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating that the permitted discharge poses a threat to the POTW and/or its personnel, the general public, or the environment; (5) Violation of any terms or conditions of the wastewater discharge permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (7) Revision or a grant of a variance from categorical pretreatment standards pursuant to 40 CFR § 403.13; (8) To correct typographical or other errors in the wastewater discharge permit; or (9) To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance with section 49-166(h). (h) Wastewater Discharge Permit Transfer. (1) Wastewater discharge permits may be transferred to a new owner or operator only if the permittee gives at least sixty (60) days prior written notice to the division, and the division approves the wastewater discharge permit transfer in writing. The notice to the division must include a written certification by the new owner or operator which: (i) States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; (ii) Identifies the specific date on which the transfer is to occur; and (iii) Acknowledges full responsibility for complying with the existing wastewater discharge permit. (2) A permittee's failure to provide advance notice of a transfer shall render the wastewater discharge permit void as of the date of the facility transfer. A new owner or operator subject to a permit transfer shall not discharge wastewater to the POTW without a valid permit. (i) Wastewater Discharge Permit Revocation. The division may revoke a wastewater discharge permit for good cause including, but not limited to, the following reasons: (i) Failure to provide prior notification to the division of significant changes to the wastewater prior to such change; (ii) Failure to notify the division of changed conditions pursuant to section 49-167(e); (iii) Misrepresentation of or failure to fully disclose all relevant facts in the wastewater discharge permit application; (iv) Falsifying any required reports, including self-monitoring reports and certification statements; (v) Tampering with monitoring equipment; (vi) Refusing to allow the division timely access to the facility premises and records; (vii) Violations of any effluent limitation, pretreatment standards or requirements or any terms of the wastewater discharge permit or this article; (viii) Failure to meet effluent limitations; (ix) Failure to pay fines; (x) Failure to pay sewer charges; (xi) Failure to pay permit and sampling fees; (xii) Failure to meet compliance schedules; or (xiii) Failure to complete a wastewater survey or the wastewater discharge permit application.

Ask a question about Scottsdale law

Corpus searches the Scottsdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.