Industrial/commercial connection fee.
Reno Administrative Code § 12.16.300
in effectSec. 12.16.300. - Industrial/commercial connection fee.
(1) The sewer connection fee will be based on the number of weighted fixture units which are being connected times the current fixture unit fee per weighted fixture unit. The number of weighted fixture units shall be in accordance with the weighted fixture unit schedule in section 12.16.150. The connection fee shall not be less than the current residential connection fee in section 12.16.290 for a single-family dwelling per connection.
Fixture Unit Industrial/Commercial Fee Schedule
INDUSTRIAL/COMMERCIAL FIXTURE UNIT FEE AND EFFECTIVE DATES
TMWRF | Lawton-Verdi/TMWRF | RSWRF
$554 | $673 | $549
Beginning July 1, 2024, the effective rate shall be subject to an automatic increase by an amount equal to the increase of the Consumer Price Index-All Urban Consumers (CPI-U) for the west urban area, as published by the Bureau of Labor Statistics. The measurement period shall end with the published index for December of each year and the resulting increases shall be implemented on July 1 of the following year which will be reflected in the fee resolution adopted by city council and kept on file in the office of the clerk and the finance department.
(2) Effective April 1, 2000, in addition to a sewer connection fee based upon weighted fixture units, any new commercial/industrial sewer connection fee shall include an additional fee component for any wastes greater in strength than 20 percent of normal domestic wastes. The basis of cost for the additional connection fee charge shall be the unit cost of each cost category (flow, BOD, SS, P and N) for which a residential connection is charged as determined by the Sewer Service Commission. Each discharger covered by this section shall be required to submit a wastewater connection fee application containing the estimated maximum monthly quantities and peak daily quantities for flow, BOD, SS, P, N and Total Dissolved Solids (TDS). The additional connection fee for Commercial/Industrial users will be based upon estimates furnished in the wastewater connection fee application and approved by the director. The environmental control discharge permit issued for which the connection fee was paid will contain the allowed flow and loading specific to the property from which the discharge will occur. The environmental control discharge permit issued under section 12.16.610. (Permit for industrial/commercial discharges) may contain provisions requiring the discharger to report future flows and strength. The environmental control discharge permit may limit actual discharge based upon the estimate furnished in the wastewater connection fee application. In the event flow and/or loading increases occur either incrementally or all at once after a connection fee is paid, additional connection fees will be assessed. The fee calculation shall be based upon the difference between the permitted flows and loads as contained in the original wastewater discharge permit and the maximum monthly flows and loads reported. The payment for the additional fees will become due and payable by the discharger 120 days after receipt of bill. The user may, within three years of occupancy, request a one-time reevaluation of the connection fee for reimbursement of the additional connection fee. Any reimbursement shall be at the rate charged at the time the connection fee was paid.
(Ord. No. 2899, § 1 (7.20.063), 8-25-80; Ord. No. 3456, § 5, 1-26-87; Ord. No. 3945, § 1, 4-24-90; Ord. No. 4055, § 1, 2-26-91; Ord. No. 5102, § 4, 12-14-99; Ord. No. 5717, § 1, 7-6-05; Ord. No. 6197, § 1, 8-24-11; Ord. No. 6646, § 2, 1-25-23)
Source: City of Reno, Nevada, Administrative Code, City Charter and Annexation and Land Development Code (Municode Library, library.municode.com)URL: https://library.municode.com/nv/reno/codes/administrative_code?nodeId=PT2READCO_TIT12PUWOUT_CH12.16SESE_ARTIISESECHRE_DIV5COFE_S12.16.300INCOCOFEFetched: 11/1/2026