Sec. 30-173. - Excavation and fills in the right-of-way.
(a) Excavation in the right-of-way shall consist of clearing and grubbing, site grading, and excavation and fills as outlined in this section.
(b) Clearing and grubbing shall consist of the entire removal and satisfactory disposal of any trees, stumps, logs, and other vegetation, and all debris within the right-of-way, or as indicated on the plans, and/or as directed by the owner's engineer. Where stumps are at least two (2) feet under this subgrade, they may be sawed off flush with the ground.
(c) Site grading shall conform to the slopes and grades specified for the intent and purpose for which the work is required. The work may be executed by any approved method and by the use of any excavating and transporting equipment adapted to the work. The finished graded surface shall present a neat, smooth surface, free from all obstructions, except trees designated to be left in place.
(d) Excavation shall consist of all cutting in the roadway and adjacent areas, and the cutting and removal of all unsuitable material, regardless of character, from the subgrade, all in conformity with the lines and grade shown on the plans. Unless directed by the owner's engineer, excavation shall not be carried below the elevations indicated on the drawings except when soft or otherwise unsuitable material is encountered. This material shall be removed and replaced with suitable material in accordance with the procedure specified for fills, with the further provision that all loose rock or boulders found in the subgrade shall be broken off and removed to a depth of not less than six (6) inches below the surface of the subgrade. Suitable material shall consist of earth, sand, gravel, or other satisfactory materials.
(e) Fills shall be built up with suitable materials from excavation which is free from mulch, trees, tree boles, rubbish, and frozen materials. Earth or friable materials used in constructing fills shall be placed in successive horizontal layers of loose material not more than eight (8) inches in depth. Each layer shall be spread uniformly and shall be wetted and rolled with a sheepsfoot roller, pneumatic tired roller, and other approved equipment, until thoroughly compacted to ninety (90) percent of maximum density obtained at optimum moisture content, as determined by the modified Proctor compaction test.
(f) Where rock is to be incorporated in fills composed largely of earth or friable materials, the rock shall be reduced to a maximum size of six (6) inches with the further provision that no rock of six-inch maximum size be within six (6) inches of the finished subgrade. Subgrade compaction shall extend a minimum distance of one (1) foot beyond the outside edges of the pavement and/or curb and gutter, and a maximum distance as determined by the width of right-of-way. Except as otherwise provided, the top six (6) inches of subgrade in every area shall be compacted to ninety-five (95) percent of maximum density obtained at optimum moisture content, as determined by the modified Proctor compaction test. The owner's engineer shall notify the department of planning and development and in matters of construction of public projects contracted with or performed by public works, the public works department at least twelve (12) hours prior to placing any material on the completed subgrade in order that the appropriate department may check the line, grade, and crown of the subgrade. If the appropriate department does not make the inspection after proper notification within the twelve-hour period the subgrade shall be deemed approved.
(g) In those instances where more than one (1) inspection by the department of planning and development and in matters of construction of public projects contracted with or performed by public works, the public works department is necessary due to what is determined by the first inspection to be unsatisfactory construction an inspection fee of twenty-five dollars ($25.00) shall be assessed against the contractor for each such additional inspection. Provided; however, where there is evidence that such unsatisfactory construction resulted by reason of an Act of God, or through no fault of the contractor or owner then no such inspection fee shall be assessed regardless of the number of inspections necessary.
(h) Upon completion of all excavation and fill within the right-of-way, the planning and development department and in matters of construction of public projects contracted with or performed by public works, the public works department may require additional proctor density tests at any given location to determine the compaction of the subgrade. The costs of all tests shall be borne by the contractor.
(i) All utility lines under any improvement shall be laid prior to setting any forms for construction. As soon as the joints of the utility lines have hardened to such an extent that they will not be damaged by backfilling, suitable materials from the spoil bank shall be brought up in compacted layers not exceeding eight (8) inches in depth of loose material. The first layer shall not extend above the spring line of the pipe in any case. Compaction of backfill shall be carefully and thoroughly done so as not to displace utility lines from their original positions. All the backfill materials shall be at optimum moisture, and shall meet density requirements outlined in this section. Every subdivision or improvement district installing utility lines underground within the right-of-way of the public streets in this city and all public utilities, including municipal-owned utilities, shall post with the city collector, a surety bond of five thousand dollars ($5,000.00), approved by the city attorney, conditioned so as to guarantee compliance with the specifications provided for in this division, which shall include the costs of tests and repairs. If the engineer of the project or the department of planning and development and in matters of construction of public projects contracted with or performed by public works, the public works department questions the matter of compliance with specifications, then he shall direct that a density test be made, the findings of which shall be conclusive.
(Code 1961, § 36-16(B)(1); Ord. No. 17,697, § 2a, 3-17-98; Ord. No. 21,867, § 1, 5-19-20)