What are the requirements for weight testing of newly installed or relocated craft?
33 C.F.R. § 150.515
in effectEffective (a) The operator must perform installation weight testing, using the procedure outlined in 46 CFR 199.45(a)(1) on each new lifeboat, rescue boat, and davit-launched liferaft system.
(b) The operator must conduct installation weight tests, according to paragraph (a) of this section, when survival crafts are relocated to another deepwater port.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-33.xmlFetched: 7/26/2026
