§ 17.28.010 — General requirements

Riverside Municipal Code (Supp. No. 33: codified through Ordinance No. 7776, enacted June 23, 2026) · Riverside Municipal Code § 17.28.010

Corpus is an independent public-information project, not the official City of Riverside website. Stable reference: corpuslaw.us/code/cb5704fc-e50e-48db-903f-d0ac075d9046

17.28.010 - General requirements.

The following standards and general requirements shall apply to all grading requiring a grading permit. In addition to the minimum standards which apply to all grading, supplementary regulations which apply to grading of hillsides and arroyos are also included. A. Cuts. 1. General. Unless otherwise recommended in the approved soils engineering and/or engineering geology report, cuts shall conform to the provisions of this section. In the absence of an approved soils engineering report, these provisions may be waived for minor cuts not intended to support structures. 2. Slope. The slope of cut surfaces shall be no steeper than is safe for the intended use and shall be no steeper than two horizontal to one vertical (2:1) unless the owner furnishes a soils engineering or an engineering geology report, or both, stating that the site has been investigated and giving an opinion that a cut at a steeper slope will be stable and not create a hazard to the public or private property and is consistent with the overall landform grading. The Public Works Director shall have the ultimate decision as to whether a slope steeper than 2:1 may be permitted. 3. Drainage and terracing shall be provided as required in Chapter 17.28. B. Fills. 1. General. Unless otherwise recommended in the approved soils engineering and/or engineering geology report, fills shall conform to the provisions of this section. In the absence of an approved soils engineering report, these provisions may be waived for minor fills not intended to support structures. 2. Preparation of ground. The ground surface shall be prepared to receive fill by removing vegetation, noncomplying fill, topsoil and other unsuitable materials, scarifying to provide a bond with the new fill and, where slopes are steeper than five to one and the height is greater than five feet, by benching into sound bedrock or other competent material as determined by the soils engineer. The bench under the toe of a fill on a slope steeper than five to one shall be at least ten feet wide. The area beyond the toe of fill shall be sloped for sheet overflow or a paved drain shall be provided. When fill is to be placed over a cut, the bench under the toe of fill shall be at least ten feet wide but the cut shall be made before placing the fill and the acceptance by the soils engineer or engineering geologist or both as a suitable foundation for fill. 3. Fill material. Detrimental amounts of organic materials shall not be permitted in fills. Except as permitted by the Public Works Director, no rock or similar irreducible material with a maximum dimension greater than 12 inches shall be buried or placed in fills. a. Exception. The Public Works Director may permit placement of larger rock when the soils engineer properly devises a method of placement and approves the fill stability. The following conditions shall also apply. (1) Prior to issuance of the grading permit, potential rock disposal areas shall be delineated on the grading plan. (2) Rock sizes greater than 12 inches in maximum dimension shall be ten feet or more below grade, measured vertically. (3) Rocks shall be placed so as to assure filling all voids with fines. 4. Compaction. All fills shall be compacted to a minimum of 90 percent of maximum density as determined by Appendix J107.5 of the California Building Code. In-place density shall be determined in accordance with recognized current ASTM standards for determining in-place density of soils. After 90 percent compaction (unless higher percentage recommended by geotechnical engineer) has been obtained, those areas of the graded site that will not be built upon may be sacrificed to promote the growth of landscaping, improve irrigation and reduce drainage problems. 5. Slope. The slope of fill surfaces shall be no steeper than is safe for the intended use and shall be no steeper than two horizontal to one vertical (2:1) unless the owner furnishes a soils engineer or an engineering geology report, or both, stating that the site has been investigated and giving an opinion that a fill at a steeper slope will be stable and not create a hazard to public property and is consistent with the overall landform grading. The Public Works Director shall have the ultimate decision as to whether a slope steeper than 2:1 may be permitted. 6. Drainage and terracing. Drainage and terracing shall be provided and the area above fill slopes and the surfaces of terraces shall be graded and paved as required by Section 17.28.010.E. C. Retaining walls. 1. Retaining walls constructed of materials architecturally consistent with the development may be permitted in lieu, or in combination with cut or fill slopes. Retaining or crib walls in an area not open to public view are permitted up to six feet in height unless a higher wall is approved administratively. Retaining or crib walls exposed to public view shall not exceed three feet in height unless approved administratively and shall be included as part of the permitted height of the slope. D. Setbacks. 1. General. Cut and fill slopes shall be setback from site boundaries in accordance with this section. Setback dimensions shall be horizontal distances measured perpendicular to the site boundary. Setback dimensions shall be as shown in attached Figure #1. Figure #1 [image omitted; see the official code] 2. Top of cut slope. The top of cut slopes shall be made not nearer to a site boundary line than one fifth of the vertical height of cut with a minimum of two feet and a maximum of ten feet. The setback may need to be increased for any required interceptor drains. 3. Toe of fill slope. The toe of fill slope shall be made not nearer to the site boundary line than one-half the height of the slope with a minimum of two feet and a maximum of 20 feet. Where a fill slope is to be located near the site boundary and the adjacent off-site property is developed, special precautions shall be incorporated in the work, as the Public Works Director deems necessary, to protect the adjoining property from damage as a result of such grading. These precautions may include but are not limited to: a. Additional setbacks. b. Provision for retaining or slough walls. c. Mechanical or chemical treatment of the fill slope surface to minimize erosion. d. Provisions for the control of surface water. 4. Modification of slope location. The Public Works Director may approve alternate setbacks. The Public Works Director may require an investigation and recommendation by a qualified engineer or engineering geologist to demonstrate that the intent of this section has been satisfied. E. Drainage and terracing. 1. General. Unless otherwise indicated on the approved grading plan, drainage facilities shall conform to the provisions of this section for cut or fill slopes steeper than three horizontal to one vertical. 2. Terraces. a. Terraces of at least six feet in width shall be established at not more than 30-foot vertical intervals on all cut or fill slopes to control surface drainage and debris except that where only one terrace is required, it shall be at mid-height. For cut or fill slopes greater than 60 feet and up to 120 feet in vertical height, one terrace at approximately mid-height shall be 12 feet in width. Terrace widths and spacing for cut and fill slopes greater than 120 feet in height shall be designed by the civil engineer and approved by the Public Works Director. Suitable access shall be provided to permit proper cleaning and maintenance. b. Swales or ditches on terraces shall have a minimum gradient of five percent and must be paved with reinforced concrete not less than three inches in thickness or an approved equal paving. They shall have a minimum depth at the deepest point of one foot and minimum paved width of five feet. c. A single run of swale or ditch shall not collect runoff from a tributary area exceeding 13,500 square feet (projected) without discharging into a downdrain. 3. Subsurface drainage. Cut and fill slopes shall be provided with subsurface drainage as necessary for stability. 4. Disposal. All drainage facilities shall be designed to carry water to the nearest practicable drainage way approved by the Public Works Director and/or other appropriate jurisdiction as a safe place to deposit such water. Erosion of ground in the area of discharge shall be prevented by installation of nonerosive downdrains or other devices. Building pads shall have a drainage gradient of two percent toward approved drainage facilities, unless waived by the Public Works Director. EXCEPTION: the gradient from the building pad may be one percent if all of the following conditions exist throughout the permit area: a. No proposed fills are greater than ten feet in maximum depth. b. No proposed finish cut or fill slope faces have a vertical height in excess of ten feet. c. No existing slope faces, which have a slope face steeper than ten horizontally to one vertically, have a vertical height in excess of ten feet. 5. Interceptor drains. Paved interceptor drains shall be installed along the top of all cut slopes where the tributary drainage area above slopes toward the cut and has a drainage path greater than 40 feet measured horizontally. Interceptor drains shall be paved with a minimum of three inches of reinforced concrete or gunite. They shall have a minimum depth of 12 inches and a minimum width of 30 inches measured horizontally against the drain. The slope of drains shall be as approved by the Public Works Director. F. Excavation blasting. 1. General. No person shall do any excavation blasting without a permit from the Fire Chief. The application for such permit shall be on forms prescribed by the Fire Chief. Before the issuance of such a permit the Fire Chief may require a grading permit issued by the Public Works Department. Any conditions contained in the grading permit shall become conditions of the excavation blasting permit. 2. Authority. The Fire Chief is designated as the issuing authority for the City of Riverside in accordance with, and for the purposes designated in Section 12007 of the Health and Safety Code of the State of California. 3. Fees. The application shall be accompanied by the current fee. 4. Requirements and conditions. In so far as applicable, the provisions of this chapter relating to conditions in permits, procedure and the like matters shall govern excavation blasting permits, but the Fire Chief shall continue to enforce all applicable laws on blasting under his jurisdiction. 5. Appeal. Any person aggrieved by the action of the Fire Chief in denying or revoking a permit required by this article for failure to meet or to comply with the provisions of this article or upon the grounds set forth in the California Fire Prevention Code and California Code of Regulations, may appeal to the City Council within ten days after the respective decision is made. G. Interpretation of standards. 1. If an ambiguity arises concerning the interpretation of the provisions for minimum grading standards or any general requirements contained in this chapter, the Community & Economic Development Director shall make a determination of what constitutes compliance with the provisions contained within the applicable section. The Community & Economic Development Director may also refer the matter to the Planning Commission for consideration. The Community & Economic Development Director shall take action pursuant to this section within working ten days of the date of a written request for interpretation. H. Inspection. 1. General. a. All grading operations for which a permit is required shall be subject to inspection. For projects involving both regular and engineered grading the permittee's civil engineer, architect or landscape architect and soils engineer as listed on the grading permit shall inspect and certify the grading. b. When the Public Works Director has cause to believe that special conditions or unusual hazards or geologic factors may be involved in a "regular grading" operation it will be required to conform to "engineered grading" requirements. 2. All grading. The permittee's civil engineer, architect, landscape architect, or soils engineer shall inspect grading at the following stages of work and shall provide written notice of approval at each stage of review to the Public Works Director: a. Rough grading stage. When rough grading has been completed and approximate final elevations have been established for building pads, drainage devices, and paved areas, and when temporary erosion control measures have been installed. This will be required for building permit issuance. b. Final grading stage. When all grading has been completed including final building pads, completed drainage devices, and permanent erosion control facilities, including slope planting and irrigation systems as required. This is required for release of utilities and certificate of occupancy. 3. Community & Economic Development Department inspection. At the discretion of the Community & Economic Development Director, the Community & Economic Development Department may also inspect engineered grading for compliance with conditions of approval which may include, but are not limited to, slope ratio, slope height, slope location, contour grading, areas of land disturbance, archaeology, paleontology, landscaping, erosion control, protection of native plants and animals, or other conditions of approval relating to environmental or aesthetic concerns. The Community & Economic Development Department shall file reports with the Public Works Director as required by the Public Works Director. Grading other than engineered grading shall be designated "Regular Grading". 4. Notification of noncompliance. If, in the course of fulfilling their responsibility under this chapter, the civil engineer, soils engineer, engineering geologist, testing agency, Public Works Department and/or Community & Economic Development Department finds that the work is not being done in conformance with this chapter or the approved grading plans, the discrepancies shall be reported immediately in writing to the permittee, the permittee's civil engineer and to the Public Works Director. It will be the permittee's civil engineer's responsibility to devise appropriate corrective measures. 5. Transfer of responsibility for approval. If the civil engineer, the soils engineer, the engineering geologist, or the testing agency of record resigns or is unable to perform his/her duties during the course of the work, the work shall be stopped until a replacement has agreed to accept responsibility for the work of the predecessor. The applicant shall provide the City with the names of the civil engineer, soils engineer, engineering geologist or the testing agency for the project. 6. Approved plans and copy of a valid grading permit shall be located on the site at all times while work is being performed. I. Completion of work. 1. Final reports. Upon completion of grading work the Public Works Director shall require the following reports, drawings and supplements thereto: a. An as-graded plan prepared by the civil engineer including original ground surface elevations, as-graded ground surface elevations, lot drainage patterns, and locations and elevations of all surface and subsurface drainage facilities. The civil engineer shall state that to the best of his or her knowledge the work was done in accordance with the final approved grading plan. b. A soils-grading report prepared by the soils engineer, including locations and elevations of field density tests, summaries of field and laboratory tests, data and comments on any changes made during grading including their effect on the recommendations made during grading and their effect on the recommendations made in the soils engineering investigation report. The report shall also include a finding as to the adequacy of the site for the intended use. c. A geologic grading report, if necessary, prepared by the engineering geologist, including a final description of the geology of the site and any new information disclosed during the grading and the effect of same on recommendations incorporated in the approved grading plan. The report shall also include a finding as to the adequacy of the site for the intended use as affected by geologic factors. 2. Notice of completion. The as-graded plan and certifications as required in Section 17.28.010.I.1. shall constitute the Notice of Completion. The Public Works Director may make a final inspection to ensure that the installation of all drainage facilities and their protective devices, landscaping and irrigation and all erosion-control measures have been completed in accordance with the final approved grading plan prior to releasing utilities or certificate of occupancy for improvements on the site.

(Ord. 7362 §9, 2017; Ord. 6453 § 1, 1998)