§ 8-100 — Successive inspections to be made

Municipal Code, City of Green Bay, Wisconsin (Supp. 10: codified through Ordinance No. 11-26, enacted July 21, 2026 (online updated October 12, 2026)) · Green Bay Municipal Code § 8-100

Corpus is an independent public-information project, not the official City of Green Bay website. Stable reference: corpuslaw.us/code/cd584af9-f7ed-44b1-a717-c4378f7a11ec

Sec. 8-100. - Successive inspections to be made.

No work shall be done on any part of a building or structure beyond the point indicated in each successive inspection without first obtaining the approval of the Building Inspection Division. Upon notification by the permit holder or an agent of the completion of each of the respective steps in construction, the Director shall make the following successive inspections in accordance with the Department of Safety and Professional Services Administrative Code and shall either approve that portion of the construction as completed or shall notify the permit holder or an agent where the same fails to comply with the law: (1) Residential and/or commercial building inspections are required following specific phases of the construction process. The list in this section is not exhaustive, and additional inspections may be required as appropriate. The Director shall perform an inspection following each of the following steps in construction: a. Footings. When forms for footings are in and ready to be poured. Forms for footings shall be framed with a minimum depth of six inch framing members. b. Foundation. When footings are fully installed and the permit holder is ready to install concrete for the walls. c. Tar, stone, and tile. When the walls are up and stone, tile, and damproofing have been installed. d. Rough-in. When the roof and all framing, fire blocking, and bracing are in place, and all pipes, chimneys, and vents are completed. e. Insulation. When the insulation has been installed. (2) Certificate of occupancy. The Chief Building Official, Plumbing Supervisor, Heating Inspector, Electrical Inspector, Engineering Department agents, and Fire Department Prevention Bureau, or their designees, shall each make a final inspection of all new buildings, additions, and alterations. If no violation of this article or any other ordinance, law, or order is found and if there is a sewer connected to the public system or a system approved by ordinance, a connection with adequate water supply and access to the premises by a graded and graveled public road, and the buildings, additions, and alterations are in compliance with the City's building, electrical, heating and air conditioning, plumbing, rat prevention, and fire prevention and control ordinances, the Director shall issue a certificate of occupancy stating the purpose for which the building is to be used and the maximum load and maximum number of persons that may be accommodated on each floor thereof. No building or part thereof shall be occupied until such certificate has been issued, except with the written consent of the Director, nor shall any building be occupied in any manner which conflicts with the conditions set forth in the certificate of occupancy. In no case shall a certificate of occupancy be issued until complete compliance with the conditions stipulated on the site plan have been met, except such certificate may be issued prior to complete compliance provided that a cash bond in an amount equal to the cost of site plan compliance, as stipulated by the Director of Public Works and indicated on the site plan, has been deposited with the City Treasurer. If all conditions have not been met within 60 days after notice by the Director of Community and Economic Development, the Director of Public Works may make the necessary installations as provided in the site plan and charge the same to the cash bond account for that particular building. (3) Commercial partial and/or temporary occupancy. Partial and/or temporary occupancy of a building may be granted subsequent to the original site plan approvals if the following conditions are met: a. The applicant has submitted a life safety plan containing the stamped seal of the supervising professional. Said life safety plan shall demonstrate to the satisfaction of the Director that all life safety components for the entire building have been completed or that an equivalent or better level of protection is in place. b. The Director and the Fire Chief have reviewed and approved the revised life safety plan described in this subsection. c. The applicant has paid an additional permit fee in an amount determined by the Director, which amount shall reflect the actual administrative costs of issuing the partial or temporary certificate of occupancy. In determining the fee amount, the Director may consider all relevant factors, including, but not limited to, the timing or urgency of the request for the partial or temporary occupancy permit, the number of inspections required to grant the partial or temporary occupancy permit, and the percentage of the building included in the partial or temporary occupancy permit. The fee for the partial or temporary occupancy permit shall not exceed 50 percent of the total permit fee.

(Ord. No. 13-24, § 1, 7-30-2024)